YOKOTA AIR BASE, Japan -- Pat Phung (far left), Yokota Resident Engineer at Japan District, poses alongside 5-1-5 members in front of a 5-1-5 project on Feb. 26, 2019. The 5-1-5 approach is based on managing construction projects with the maximum objectives of five percent cost and 15 percent time growth. The award is given to internal staff, as well as stakeholders and partners. Pictured from left to right: Kris Namoca, Air Force Civil Engineer Center, Master Sgt. Sean Finegan, Air Force Special Operations Command (AFSOC), Cpt. Sarah Swale, AFSOC. (Photo: courtesy Japan Engineer District)
Date Taken: | 02.26.2019 |
Date Posted: | 08.02.2019 23:02 |
Photo ID: | 5639139 |
VIRIN: | 190226-D-WR005-321 |
Resolution: | 4032x3024 |
Size: | 2.28 MB |
Location: | YOKOTA AIR BASE, JP |
Web Views: | 28 |
Downloads: | 2 |
This work, 5-1-5 approach building strong teams and partnerships, by Ana Allen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.