(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Construction of temporary facility in Yuma, Ariz has been completed.

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows a row of large white HVAC/climate control units from United Rentals positioned along the interior wall of a white event tent. The units are lined up on a black mat surface beside artificial green turf flooring. Multiple electrical cables and connections are visible running along the base of the equipment.

    Construction crews complete a temporary housing facility June 26, 2019 in Yuma, Ariz. as part of an ongoing response to the current border security and humanitarian crisis along the Southwest border. U.S. Customs and Border Protection photo by Jerry Glaser

    IMAGE INFO

    Date Taken: 06.26.2019
    Date Posted: 06.28.2019 12:49
    Photo ID: 5534859
    VIRIN: 190627-H-GD279-0010
    Resolution: 5472x3648
    Size: 9.92 MB
    Location: YUMA, ARIZONA, US

    Web Views: 54
    Downloads: 3

    PUBLIC DOMAIN