Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    KC-46A equipment processing begins

    KC-46A equipment processing begins

    KS, UNITED STATES

    10.27.2015

    Photo by Senior Airman Victor J. Caputo  

    22nd Air Refueling Wing

    Rick Hammock, 97th Maintenance Squadron aerospace ground equipment work leader from Altus Air Force Base, Okla., examines a mobile power generator for the KC-46A Pegasus with Staff Sgt. Detreck Ortiz, middle, 22nd MXS aerospace ground equipment journeyman, and Staff Sgt. Allan Shurtz, 931st MXS aerospace ground equipment journeyman, Oct. 27, 2015, at McConnell Air Force Base, Kan. Personnel from the three maintenance squadrons are working with the 22nd Logistics Readiness Squadron as maintenance equipment is shipped to McConnell in preparation of the arrival of the KC-46. (U.S. Air Force photo/Senior Airman Victor J. Caputo)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 10.27.2015
    Date Posted: 10.28.2015 15:12
    Photo ID: 2254597
    VIRIN: 151027-F-AM292-018
    Resolution: 3965x2832
    Size: 2.03 MB
    Location: KS, US

    Web Views: 41
    Downloads: 3

    PUBLIC DOMAIN