Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    ‘This is depot work – this is what this base was meant to do’

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    ‘This is depot work – this is what this base was meant to do’

    WARNER ROBINS, GEORGIA, UNITED STATES

    08.12.2015

    Photo by Tommie Horton 

    78th Air Base Wing

    Dennis E. Pickett, 561st Aircraft Maintenance Squadron aircraft structural repair technician, installs fasteners into the newly replaced 626 bulkhead of an F-15C. During programmed depot maintenance, a crack was discovered in the original bulkhead leaving the organization with the option to replace the part or scrap the entire aircraft. The aircraft was placed into an unscheduled depot level maintenance gate where the bulkhead was replaced with another located through the Defense Logistics Agency supply chain. The entire process from aircraft disassembly to new bulkhead installation took the core team seven weeks to complete. (U.S. Air Force photo by Tommie Horton)

    IMAGE INFO

    Date Taken: 08.12.2015
    Date Posted: 08.21.2015 08:39
    Photo ID: 2134944
    VIRIN: 150812-F-UI543-004
    Resolution: 5520x3680
    Size: 8.94 MB
    Location: WARNER ROBINS, GEORGIA, US

    Web Views: 67
    Downloads: 15

    PUBLIC DOMAIN