Construction crews resume groundwork of the multi-use facility here Feb. 27, 2015, after a two-week delay due to weather. The trench exposes water lines for connection to the new line. The new TEC dormitory and classroom facility will contain approximately 47,000 square feet of additional space on three levels and two levels with ten 20-person and two 100-person classrooms, HD audio/visual capabilities, wireless capability, 97 single occupancy dorm rooms, energy efficient natural and led lighting, hearing and mobility accessible accommodations. (U.S. Air National Guard photo by Master Sgt. Jerry D. Harlan/Released)
Date Taken: | 02.27.2015 |
Date Posted: | 02.27.2015 15:40 |
Photo ID: | 1790751 |
VIRIN: | 150227-F-MK871-012 |
Resolution: | 4928x3280 |
Size: | 5.02 MB |
Location: | MCGHEE TYSON AIR NATIONAL GUARD BASE, TN, US |
Web Views: | 17 |
Downloads: | 1 |
This work, Work must go on, by SMSgt Jerry Harlan, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT