Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Wiring for the future: 1194th soldiers install electrical wiring in building at Camp Ravenna [Image 3 of 4]

    Wiring for the future: 1194th soldiers install electrical wiring in building at Camp Ravenna

    CAMP RAVENNA, OH, UNITED STATES

    06.06.2011

    Photo by Spc. Brian Johnson 

    216th Engineer Battalion

    Spc. Julian McLaughlin from Columbus works to install an electrical box, June 6, at the Camp Ravenna Joint Maneuver Training Center in northeast Ohio. McLaughlin is a member of the Chillicothe based 1194th Engineer Company which is currently conducting their two-week annual training. As part of their annual training, the soldiers of the 1194th are helping to add modern electrical wiring to a warehouse at the Camp Ravenna training area.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.06.2011
    Date Posted: 03.13.2012 18:45
    Photo ID: 541407
    VIRIN: 110606-A-3179J-502
    Resolution: 960x1501
    Size: 538.06 KB
    Location: CAMP RAVENNA, OH, US
    Hometown: COLUMBUS, OH, US

    Web Views: 16
    Downloads: 1

    PUBLIC DOMAIN