Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Wiring for the future: 1194th soldiers install electrical wiring in building at Camp Ravenna [Image 1 of 4]

    Wiring for the future: 1194th soldiers install electrical wiring in building at Camp Ravenna

    CAMP RAVENNA, OH, UNITED STATES

    06.06.2011

    Photo by Spc. Brian Johnson 

    216th Engineer Battalion

    Pfc. Riaan Saran from Cleveland examines an electrical junction box, June 6, at the Camp Ravenna Joint Maneuver Training Center in northeast Ohio.Saran is a member of the Chillicothe based 1194th Engineer Company. The 1194th is currently conducting their two week annual training which includes electrical missions.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.06.2011
    Date Posted: 03.13.2012 18:43
    Photo ID: 541405
    VIRIN: 110606-A-3179J-500
    Resolution: 1131x1698
    Size: 654.72 KB
    Location: CAMP RAVENNA, OH, US
    Hometown: CLEVELAND, OH, US

    Web Views: 19
    Downloads: 1

    PUBLIC DOMAIN