Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Maintaining the mission [Image 8 of 9]

    Maintaining the mission

    ALTUS AIR FORCE BASE, OK, UNITED STATES

    01.21.2015

    Photo by Senior Airman Franklin Ramos 

    97th Air Mobility Wing

    Ramiro Solis, 97th Maintenance Directorate isochronal inspection work leader, briefs maintainers prior to lifting a U.S. Air Force KC-135 Stratotanker refueling aircraft with aircraft jacks, Jan. 21, 2015. Solis assigned members specific rules and briefed them about the tasks and safety precautions. It takes maintainers at least 12 days to thoroughly inspect the aircraft ensuring damaged parts are repaired or replaced. (U.S. Air Force photo by Senior Airman Franklin R. Ramos/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.21.2015
    Date Posted: 01.23.2015 08:59
    Photo ID: 1732402
    VIRIN: 150121-F-FV476-008
    Resolution: 2100x1500
    Size: 2.91 MB
    Location: ALTUS AIR FORCE BASE, OK, US

    Web Views: 25
    Downloads: 2

    PUBLIC DOMAIN