Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Maintaining the mission [Image 6 of 9]

    Maintaining the mission

    ALTUS AIR FORCE BASE, OK, UNITED STATES

    01.15.2015

    Photo by Senior Airman Franklin Ramos 

    97th Air Mobility Wing

    Members of the 97th Maintenance Directorate attach an air refueling boom to a U.S. Air Force KC-135 Stratotanker refueling aircraft inside Hangar 285 during an inspection, Jan. 15, 2015. A boom sling is used to ensure the air refueling boom does not fall due to hydraulic or electrical power failures. It takes maintainers at least 12 days to thoroughly inspect the aircraft, ensuring damaged parts are repaired or replaced. (U.S. Air Force photo by Senior Airman Franklin R. Ramos/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.15.2015
    Date Posted: 01.23.2015 09:00
    Photo ID: 1732387
    VIRIN: 150115-F-FV476-049
    Resolution: 1500x2100
    Size: 1.65 MB
    Location: ALTUS AIR FORCE BASE, OK, US

    Web Views: 36
    Downloads: 1

    PUBLIC DOMAIN