Corps of Engineers officials witness the testing of the model hydropower turbine Oct. 8, 2014 at a Voith Hydro laboratory in York, Pa., to ensure it meets required specifications before the manufacturing process and work to modernize the power house begins at Center Hill Dam in Lancaster, Tenn.
Date Taken: | 10.08.2014 |
Date Posted: | 10.11.2014 23:55 |
Photo ID: | 1611729 |
VIRIN: | 141008-A-EO110-007 |
Resolution: | 4288x2848 |
Size: | 5.19 MB |
Location: | YORK, PA, US |
Web Views: | 33 |
Downloads: | 0 |
This work, Hydropower model tests generate positive results for Center Hill rehab project [Image 10 of 10], by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT