U.S. Army Spc. Daniel L. Nelson, an interior electrician with the 461st Engineer Company, cuts a piece of metal with an electric saws-all tool during exercise Castle Installation Related Construction at Joint Base McGuire-Dix-Lakehurst, N.J., July 19, 2013. The mission of the 461st Engineer Company was to tear down an old latrine and build a new one. (U.S. Army photo by Spc. True Thao)
Date Taken: | 07.19.2013 |
Date Posted: | 07.24.2013 18:20 |
Photo ID: | 979953 |
VIRIN: | 130719-A-BW446-049 |
Resolution: | 3456x5184 |
Size: | 3.37 MB |
Location: | JOINT BASE MCGUIRE-DIX-LAKEHURST, NJ, US |
Web Views: | 36 |
Downloads: | 4 |
This work, Castle IRC 2013 [Image 5 of 5], by SSG True Thao, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT