Soldiers of the 2nd Brigade Combat Team and engineers of the 3rd Infantry Division prepare to build the perimeter walls of Patrol Base Dezil, April 19, in Sayafiyah, south of Baghdad. Soldiers of the 26th Brigade Support Battalion, 2nd BCT, 3rd Inf. Div. delivered 300 T-walls to the site of the base. (Photo/Capt. Trista Mustaine)
Date Taken: | 04.19.2008 |
Date Posted: | 04.04.2012 09:48 |
Photo ID: | 86217 |
Resolution: | 1632x1224 |
Size: | 890.19 KB |
Location: | KALSU, IQ |
Web Views: | 129 |
Downloads: | 23 |
This work, 26th BSB sprints to finish build-up of PB Dezil [Image 3 of 3], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT