Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Graphic explaining how the Key Bridge Unified Command prepares to remove the bridge piece that lies atop the M/V Dali. [Image 1 of 2]

    Graphic explaining how the Key Bridge Unified Command prepares to remove the bridge piece that lies atop the M/V Dali.

    UNITED STATES

    05.08.2024

    Courtesy Photo

    U.S. Coast Guard Headquarters   

    A graphic explaining how the Key Bridge Unified Command prepares to remove the bridge piece that lies atop the M/V Dali. This infographic also shows that the area covered by the established Safety Zone is also the area where hearing protection is required during the precision cutting on section 4 of the Francis Scott Key Bridge. A portion of Hawkins Point is included in this zone, and focused efforts will be made to ensure those in the area are prepared for the event. Removing the bridge section, in the fastest, safest, and most predictable means requires the use of precision cuts made by these small charges.
    (Key Bridge Unified Command video by U.S. Army Corps of Engineers visual information specialist Christopher Rosario)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 05.08.2024
    Date Posted: 05.08.2024 07:44
    Photo ID: 8389830
    VIRIN: 240508-G-D0105-1003
    Resolution: 2250x2893
    Size: 4.38 MB
    Location: US

    Web Views: 116
    Downloads: 2

    PUBLIC DOMAIN