Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    FRCSE debuts electrical discharge machining device on its F-5 Aircraft Production Line [Image 5 of 5]

    FRCSE debuts electrical discharge machining device on its F-5 Aircraft Production Line

    JACKSONVILLE, FL, UNITED STATES

    01.24.2024

    Photo by Toiete Jackson 

    Fleet Readiness Center Southeast

    240124-N-DG679-1045
    JACKSONVILLE, Fla. (Jan. 24, 2024)
    Sheet Metal Mechanic Troy James, assigned to the Fleet Readiness Center Southeast (FRCSE) F-5 Aircraft Production Line, uses an E-Drill to remove metal fasteners on an F-5 Tiger II vertical stabilizer as Dr. Luis Carney, FRCSE’s senior materials engineer, observes. FRCSE’s F-5 Production Line is the first to implement the E-Drill within the NAVAIR enterprise. The device will significantly reduce the time it takes to remove the thousands of rivets typically replaced during in-depth depot-level maintenance. (U.S. Navy Photo by Toiete Jackson/Release)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.24.2024
    Date Posted: 03.13.2024 15:49
    Photo ID: 8286294
    VIRIN: 240124-N-DG679-1045
    Resolution: 3279x2160
    Size: 1.26 MB
    Location: JACKSONVILLE, FL, US

    Web Views: 17
    Downloads: 2

    PUBLIC DOMAIN