Camera Icon

Images: Capability Set 13 vehicles complete prototype assembly [Image 2 of 2]

Photo by Katie CainSmall RSS IconSubscriptions Icon

Capability Set 13 vehicles complete prototype assembly

The five "super configuration" MRAP prototype vehicles equipped with Capability Set 13, built at the U.S. Army Tank Automotive Research, Development and Engineering Center, in Warren, Mich., were shipped from TARDEC to Aberdeen Proving Ground, Md., to undergo safety release testing.



Web Views
122
Downloads
12

Podcast Hits
0



Public Domain Mark
This work, Capability Set 13 vehicles complete prototype assembly [Image 2 of 2], by Katie Cain, identified by DVIDS, is free of known copyright restrictions under U.S. copyright law.

Date Taken:08.07.2012

Date Posted:08.28.2012 19:17

Photo ID:653485

VIRIN:100615-O-#####-212

Resolution:5184x3456

Size:7.48 MB

Location:WARREN, MI, USGlobe

Gallery Images

More Like This

  • The Prototype Integration Facility (PIF) at the U.S. Army Tank Automotive Research, Development and Engineering Center (TARDEC), where the first five "super configuration" Mine Resistant Ambush Protected (MRAP) prototype vehicles equipped with Capability Set 13 assets are being built. The MRAP configurations include Soldier Network Extension (SNE), Point of Presence (PoP), Vehicular Wireless Package (VWP), MaxxPro MRAP and MRAP-Lite.
  • Secretary of Defense Leon E. Panetta, left, listens as Dean McGrew, with the U.S. Army Tank Automotive Research, Development and Engineering Center, describes the features of a diesel-electric hybrid troop vehicle prototype on display in the Pentagon courtyard during the Pentagon's Energy Security Event, Oct. 4, 2012. (DoD photo by Glenn Fawcett)
  • The five "super configuration" Mine Resistant Ambush Protected prototype vehicles equipped with Capability Set 13 assets were built and integrated at the U.S. Army Tank Automotive Research, Development and Engineering Center, in Warren, Mich., and shipped to Aberdeen Proving Ground, Md., in late August 2012 to undergo safety release testing prior to fielding to the 10th Mountain Division for New Equipment Training beginning this October. The M-ATV-Lite (shown here) was the first vehicle shipped.
  • Dozens of engineers and support personnel at the U.S. Army Tank Automotive Research, Development and Engineering Center, in Warren, Mich., immersed in daily integration/production activities on the first five "super configuration" Mine Resistant Ambush Protected prototype vehicles equipped with Capability Set 13 assets. CS 13 is the first integrated group of networked technologies - radios, sensors and associated equipment and software - that will deliver an integrated voice and data capability throughout the entire Brigade Combat Team formation, from the brigade commander to the dismounted soldier.

Associated News

Capability Set 13 vehicles complete prototype assembly

Options

  • Army
  • Marines
  • Navy
  • Air Force
  • Coast Guard
  • National Guard

HOLIDAY GREETINGS

SELECT A HOLIDAY:

VIDEO ON DEMAND

  • Facebook
  • Twitter
  • Youtube
  • Flickr