Under a contract awarded by USACE, transmission lines will be repaired from the Kajaki Dam substation south to Durai Junction in the Helmand province.(USACE photo – Chief Warrant Officer 5 Thomas Black)
Date Taken: | 07.05.2011 |
Date Posted: | 07.06.2012 14:06 |
Photo ID: | 619490 |
VIRIN: | 110705-A-ZZ999-009 |
Resolution: | 3235x2198 |
Size: | 1.68 MB |
Location: | HELMAND PROVINCE, AF |
Web Views: | 43 |
Downloads: | 8 |
This work, US Army Corps of Engineers will improve electrical distribution in Helmand province [Image 9 of 9], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT