Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Improvements to Kajaki dam power potential in southern Afghanistan [Image 5 of 5]

    Improvements to Kajaki dam power potential in southern Afghanistan

    Technicians with the U.S. Army Corps of Engineers and Afghan engineers assigned to the Kajaki hydroelectric power plant check the recently built electrical grid in the vicinity of the dam. The U.S. Army Corps of Engineers’ Afghanistan Engineer District-South and Afghan engineers recently completed installation of a primary switch center at the Kajaki dam to resolve electrical problems.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 07.11.2011
    Date Posted: 07.14.2011 06:07
    Photo ID: 427483
    VIRIN: 110711-N-TH989-083
    Resolution: 2832x4256
    Size: 3.43 MB
    Location: KAJAKI, AF

    Web Views: 150
    Downloads: 9

    PUBLIC DOMAIN