Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    PHNSY electricians check crane wind speed indicator [Image 7 of 10]

    PHNSY electricians check crane wind speed indicator

    PEARL HARBOR, HI, UNITED STATES

    01.29.2010

    Photo by Liane Nakahara 

    Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility

    Pearl Harbor Naval Shipyard electricians Landon Nakayama, right, and Evan Egdamin conduct wind speed indicator checks on a Shipyard portal crane. The wind speed indicator monitors wind speed changes. This data is used by operators to determine if conditions are stable enough for the crane to operate safely. The wind speed indicator is located at the highest point on the crane that maintenance personnel can climb to.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.29.2010
    Date Posted: 04.27.2011 19:32
    Photo ID: 394908
    VIRIN: 100129-N-3944N-094
    Resolution: 1884x2741
    Size: 394.1 KB
    Location: PEARL HARBOR, HI, US

    Web Views: 149
    Downloads: 3

    PUBLIC DOMAIN