Seaman Brian Crawford, sonar technician (surface), stationed aboard guided missile destroyer USS Forrest Sherman takes in mooring line four as the ship gets underway. Forrest Sherman is deployed participating in Exercise Joint Warrior 2011-1. Joint Warrior serves as a certifying event for ships deploying with coalition forces in future operations. (U.S. Navy photo by Petty Officer 1st Class W. B. Swoboda/RELEASED)
| Date Taken: | 04.03.2011 |
| Date Posted: | 04.05.2011 09:50 |
| Photo ID: | 386462 |
| VIRIN: | 110403-N-QO025-020 |
| Resolution: | 2100x1406 |
| Size: | 338.08 KB |
| Location: | USS FORREST SHERMAN, USEUCOM, AT SEA |
| Web Views: | 50 |
| Downloads: | 2 |
This work, Seaman Brian Crawford takes in mooring line four as USS Forrest Sherman gets underway. [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.