Spc. Andrew Chetta and Spc. Matthew Ellard, 239th Multi-Role Bridge Company, work to remove a support cable used to hold the Qayyarah bridge in place before the bridge is removed during a 24-hour operation in Qayyarah, Iraq, June20.
Date Taken: | 06.20.2010 |
Date Posted: | 07.01.2010 08:02 |
Photo ID: | 295386 |
VIRIN: | 100620-A-8151G-002 |
Resolution: | 2000x1328 |
Size: | 1.94 MB |
Location: | MOSUL, IQ |
Web Views: | 83 |
Downloads: | 8 |
This work, Bridge Over River Tigris: 239th MR Bridge Company Remove Tigris River Bridge [Image 10 of 10], by Dustin Gautney, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT