Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Joint engineer mission to span the Tigris [Image 2 of 5]

    Joint engineer mission to span the Tigris

    BAGHDAD, IRAQ

    08.07.2009

    Photo by Sgt. Rebekah Malone 

    225th Engineer Brigade

    Photo of a Maybey Johnson Float bridge installed over a river, the same type that will be installed once preparations are completed by the 277th Engineer Company, 46th Engineer Battalion, 225th Engineer Brigade in a few days. The engineers are using the bridge to span a 90 meter section of the Tigris River in order to decrease travel time and reduce traffic in the cities near Taji, north of Baghdad.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.07.2009
    Date Posted: 08.07.2009 06:21
    Photo ID: 193167
    VIRIN: 090807-A-8932M-002
    Resolution: 802x602
    Size: 49.24 KB
    Location: BAGHDAD, IQ

    Web Views: 390
    Downloads: 68

    PUBLIC DOMAIN