Iraqi leaders from the ministry of electricity cut the ceremonial ribbon to signify the opening of a new 33-volt feeder line providing power to the citizens of Agurquf, April 8, in the Abu Ghraib District. The joint project will provide more reliable power with greater redundancy in reducing the chance of power failure from overloading to the people of Agurquf.
Date Taken: | 04.08.2009 |
Date Posted: | 04.13.2009 13:17 |
Photo ID: | 164742 |
VIRIN: | 090413-O-9999T-002 |
Resolution: | 1750x1250 |
Size: | 359.6 KB |
Location: | BAGHDAD, IQ |
Web Views: | 117 |
Downloads: | 15 |
This work, Joint effort brings reliable power to Agurquf area [Image 4 of 4], by SSG Brian Tierce, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT