Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    145th Maintenance Group works together to complete structural inspection [Image 5 of 9]

    145th Maintenance Group works together to complete structural inspection

    U.S. Air Force Tech. Sgt. Michael Beam, 145th Maintenance Squadron, smoothes the edge of a propeller blade for metal fragmentation, and paints the tip during a C-130 Hercules aircraft 540-day structural inspection where preventative maintenance is done and components are checked for functionality at the North Carolina Air National Guard Base, Charlotte Douglas International Airport, Sept. 16, 2014. (U.S. Air National Guard photo by Staff Sgt. Julianne M. Showalter, 145th Public Affairs/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.16.2014
    Date Posted: 09.16.2014 16:26
    Photo ID: 1552627
    VIRIN: 140916-Z-RZ465-105
    Resolution: 4288x2848
    Size: 3.28 MB
    Location: CHARLOTTE, NC, US

    Web Views: 17
    Downloads: 0

    PUBLIC DOMAIN