Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USACE builds on AF’s vision [Image 6 of 6]

    USACE builds on AF’s vision

    OSAN AIR BASE, SOUTH KOREA

    06.05.2014

    Photo by Airman 1st Class Ashley Thum 

    51st Fighter Wing

    A slip form paver stands ready to resume laying concrete during construction of a second runway on Osan Air Base, Republic of Korea, June 5, 2014. The machine is capable of paving 1,200 feet per day. (U.S. Air Force photo/Airman 1st Class Ashley J. Thum)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.05.2014
    Date Posted: 07.08.2014 20:42
    Photo ID: 1438930
    VIRIN: 140605-F-FM358-066
    Resolution: 3593x2301
    Size: 4.08 MB
    Location: OSAN AIR BASE, KR

    Web Views: 12
    Downloads: 2

    PUBLIC DOMAIN