Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New Horizons construction progress on schedule [Image 30 of 42]

    New Horizons construction progress on schedule

    BELIZE CITY, BELIZE

    04.09.2014

    Photo by Tech. Sgt. Kali Gradishar 

    12th Air Force (Air Forces Southern)

    U.S. Air Force Staff Sgt. Jon Espinoza, New Horizons structures engineer from the 99th Civil Engineer Squadron at Nellis Air Force Base, Nev., readies mortar for laying block at the Stella Maris School Belize Academy for the Deaf construction site April 9, 2014, in Belize City, Belize. The site is one of five sites throughout Belize receiving new facilities built by U.S. military and Belize Defence Force engineers. The construction is part of New Horizons Belize 2014, an exercise geared toward mutual training and cooperation amongst Belize Defence Force, Canadian military, U.S. Air Force, U.S. Army and U.S. Marine Corps members. The opening ceremonies for the event are scheduled 10 a.m. April 10 at the Edward P. Yorke school in Belize City, Belize. (U.S. Air Force photo by Tech. Sgt. Kali L. Gradishar/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.09.2014
    Date Posted: 04.09.2014 22:08
    Photo ID: 1236247
    VIRIN: 140409-F-EE220-084
    Resolution: 2752x3656
    Size: 2.75 MB
    Location: BELIZE CITY, BZ

    Web Views: 18
    Downloads: 2

    PUBLIC DOMAIN