U.S. Air Force Staff Sgt. Jon Espinoza, New Horizons structures engineer from the 99th Civil Engineer Squadron at Nellis Air Force Base, Nev., readies mortar for laying block at the Stella Maris School Belize Academy for the Deaf construction site April 9, 2014, in Belize City, Belize. The site is one of five sites throughout Belize receiving new facilities built by U.S. military and Belize Defence Force engineers. The construction is part of New Horizons Belize 2014, an exercise geared toward mutual training and cooperation amongst Belize Defence Force, Canadian military, U.S. Air Force, U.S. Army and U.S. Marine Corps members. The opening ceremonies for the event are scheduled 10 a.m. April 10 at the Edward P. Yorke school in Belize City, Belize. (U.S. Air Force photo by Tech. Sgt. Kali L. Gradishar/Released)
Date Taken: | 04.09.2014 |
Date Posted: | 04.09.2014 22:08 |
Photo ID: | 1236247 |
VIRIN: | 140409-F-EE220-084 |
Resolution: | 2752x3656 |
Size: | 2.75 MB |
Location: | BELIZE CITY, BZ |
Web Views: | 18 |
Downloads: | 2 |
This work, New Horizons construction progress on schedule [Image 42 of 42], by 1st Lt. Kali Gradishar, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT