Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    D-M hosts 16.4 MW solar array ribbon cutting ceremony [Image 3 of 6]

    D-M hosts 16.4 MW solar array ribbon cutting ceremony

    TUCSON, AZ, UNITED STATES

    02.13.2014

    Photo by Airman 1st Class Chris Massey 

    355th Wing

    Bob Powell, North America, SunEdison Solar Energy president, speaks at the photovoltaic solar array ribbon cutting ceremony at Davis-Monthan Air Force Base, Ariz., Feb. 13, 2014. In 2010, Davis-Monthan entered into an agreement with SunEdison, LLC to design, finance, build, operate and maintain the array on 170 acres of underutilized land at two locations on base. (U.S. Air Force Photo by Airman 1st Class Chris Massey/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 02.13.2014
    Date Posted: 02.14.2014 14:10
    Photo ID: 1167758
    VIRIN: 140213-F-ZT877-116
    Resolution: 3184x2120
    Size: 1.26 MB
    Location: TUCSON, AZ, US

    Web Views: 25
    Downloads: 1

    PUBLIC DOMAIN