Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Bagram ECP survey [Image 3 of 3]

    Bagram ECP survey

    BAGRAM AIR FIELD, AFGHANISTAN

    11.20.2013

    Photo by 1st Lt. Laura Beebe 

    130th Engineer Brigade

    Pfc. Eli Vick, a technical engineer assigned to the survey and design section, JTF Sapper, stakes out where the new route will be placed at one of the Bagram entry control points, Nov. 20. (Photo by U.S. Army 1st Lt. Laura B. Beebe, JTF Sapper Public Affairs)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.20.2013
    Date Posted: 11.27.2013 07:16
    Photo ID: 1061689
    VIRIN: 131120-A-SX978-028
    Resolution: 4464x2976
    Size: 4.58 MB
    Location: BAGRAM AIR FIELD, AF

    Web Views: 209
    Downloads: 4

    PUBLIC DOMAIN