Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Upgrading C2: Common Aviation Command and Control (CAC2S) Phase 1, achieves Full Operating Capability With Fielding to Marine Air Control Squadron 24 [Image 3 of 6]

    Upgrading C2: Common Aviation Command and Control (CAC2S) Phase 1, achieves Full Operating Capability With Fielding to Marine Air Control Squadron 24

    Tactical air defense controllers and air control electronics operators with Marine Air Control Squadron 24, 4th Marine Aircraft Wing run simulations on the new Common Aviation Command and Control System (CAC2S) Sept. 12. The Marines received training on the new systems during their fielding of the new system, which was the final fielding in Phase I of the CAC2S program.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.12.2013
    Date Posted: 09.23.2013 12:59
    Photo ID: 1024085
    VIRIN: 130912-M-VB498-011
    Resolution: 4368x2912
    Size: 6.26 MB
    Location: VIRGINIA BEACH, VA, US

    Web Views: 480
    Downloads: 42

    PUBLIC DOMAIN