Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Graphical representation of how the precision cutting charges will be used on key bridge section

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    UNITED STATES

    05.08.2024

    Courtesy Video

    U.S. Coast Guard Headquarters   

    A graphical representation of how the Key Bridge Unified Command prepares to remove the bridge piece that lies atop the M/V Dali. Removing the bridge section, in the fastest, safest, and most predictable means requires the use of precision cuts made by these small charges.
    (Key Bridge Unified Command video by U.S. Army Corps of Engineers visual information specialist Jake Pope)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 05.08.2024
    Date Posted: 05.08.2024 07:46
    Category: PSA
    Video ID: 922471
    VIRIN: 240508-G-D0105-1001
    Filename: DOD_110290914
    Length: 00:01:20
    Location: US

    Video Analytics


    Downloads: 17
    High-Res. Downloads: 17

    PUBLIC DOMAIN