Navy Capt. (Dr.) Melissa Austin, director, Walter Reed National Military Medical Center, briefs the Walter Reed team on updates for the Medical Center Additions and Alterations (MCAA) project, setting the stage for the future opening of MCAA South at Walter Reed, April 23, 2024.
(DOD video by Ricardo J. Reyes)
Date Taken: | 04.23.2024 |
Date Posted: | 04.23.2024 12:31 |
Category: | Newscasts |
Video ID: | 920479 |
VIRIN: | 240423-N-EC642-1001 |
Filename: | DOD_110255145 |
Length: | 00:01:17 |
Location: | BETHESDA, MD, US |
Downloads: | 5 |
High-Res. Downloads: | 5 |
This work, Walter Reed Updates Staff On New Construction Delays, by Ricardo Reyes-Guevara, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT