Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    JBLM Wastewater Treatment Plant Ribbon Cutting

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    The ribbon was cut today on the upgraded JBLM Wastewater Treatment Plant that will serve all of JBLM, Camp Murray, and the VA Center in Lakewood. This facility replaces the Solo Point WWTP which was built in the 1950s, and ensures JBLM meets current and future water quality requirements for Puget Sound.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 11.21.2016
    Date Posted: 11.22.2016 17:36
    Category: Briefings
    Video ID: 494671
    VIRIN: 161121-D-ML822-301
    Filename: DOD_103874038
    Length: 00:28:34
    Location: WA, US

    Video Analytics


    Downloads: 0
    High-Res. Downloads: 0

    PUBLIC DOMAIN