Construction Site of the new Access Control Point (ACP) at Lucius D. Clay Kaserne, Wiesbaden, Germany. Groundbreaking was 12 March 2014. The construction is scheduled to be completed by the end of December 2014. Also available in high definition.
Date Taken: | 04.08.2014 |
Date Posted: | 04.09.2014 08:31 |
Category: | B-Roll |
Video ID: | 328450 |
VIRIN: | 141408-A-AD638-029 |
Filename: | DOD_101306272 |
Length: | 00:02:57 |
Location: | WIESBADEN, HE, DE |
Downloads: | 2 |
High-Res. Downloads: | 2 |
This work, Construction of Access Control Point, by Volker Ramspott, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT