Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Kajaki Dam Primary Switch Center Installation

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    B-roll of the Kajaki Dam and the installation of a primary switching center installed by U.S. Army Corps of Engineers' Afghanistan Engineer District South. Scenes include various shots of the dam, inside and out and a tour of the dam by the engineers. Produced by Lance Cpl. Bryan Nygaard. Also available in high definition.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 07.11.2011
    Date Posted: 07.15.2011 14:06
    Category: B-Roll
    Video ID: 120709
    Filename: DOD_100207170
    Length: 00:05:02
    Location: AF

    Video Analytics


    Downloads: 20
    High-Res. Downloads: 20

    PUBLIC DOMAIN