Marine Corps Base Camp Pendleton, Naval Weapons Station Seal Beach and Teehee Engineering Incorporation host a ribbon cutting ceremony to commemorate the newly renovated Fallbrook Gate at NWS Seal Beach, Fallbrook, Aug. 24. The project added infrastructure to improve traffic flow through the Fallbrook gate to relieve congestion backed up into the city of Fallbrook.
Date Taken: | 08.24.2012 |
Date Posted: | 08.27.2012 18:20 |
Photo ID: | 652902 |
VIRIN: | 120824-M-QN491-054 |
Resolution: | 4021x2681 |
Size: | 1.71 MB |
Location: | CAMP PENDLETON, CA, US |
Web Views: | 67 |
Downloads: | 1 |
This work, Leaders cut ribbon for Fallbrook gate renovation, by Sgt Michael Iams, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT