The flyover bridge is being assembled at a nearby location and will be moved into place by four self propelled mobile transports.
Date Taken: | 11.19.2013 |
Date Posted: | 11.22.2013 12:04 |
Photo ID: | 1058482 |
VIRIN: | 131119-A-CE999-007 |
Resolution: | 1888x1251 |
Size: | 433.9 KB |
Location: | US |
Web Views: | 27 |
Downloads: | 2 |
This work, Middle East District constructs Naval Support Activity Bahrain Flyover Bridge, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT