Government of Iraq Renews Bridge of Ruins
2nd Stryker Brigade 25th Infantry Division
Story by Pfc. Lyndsey Dransfield
Date: 07.25.2008
Posted: 07.25.2008 04:35
By Pfc. Lyndsey R. Dransfield
2nd Stryker Brigade Combat Team, 25th Infantry Division Public Affairs Office
CAMP TAJI, Iraq – Engineers with 2nd Stryker Brigade Combat Team "Warrior," 25th Infantry Division, Multi-National Division – Baghdad, journeyed to the Grand Canal Bridge in Taji Qada, northwest of Baghdad July 22, 2008, to monitor repair progress.
The bridge which spans a portion of the Grand Canal and is one of the key crossing along the main highway, west of the Tigris River was damaged by two terrorist attacks last year.
The first attack happened May 11, 2007, when a terrorist drove a vehicle-born improvised explosive device onto the middle of the southbound lane. When it detonated, it left a massive hole in the middle of the lane. The second attack occurred August 14, 2007. Another VBIED was detonated in the northbound lane, sending a large span of the bridge plummeting into the water below.
Although temporary fixes were made, the damage caused other side effects such as increased traffic and severe corrosion to the river banks.
A local Iraqi construction company, Rownaq al Mas, was contracted by the government of Iraq to rebuild both lanes of the bridge and remove fallen debris from the canal below.
"What is most significant about this project is that the Iraqis are doing this completely on their own," said Capt. Mark Gillman, a native of Las Vegas, and assistant engineer, 2nd SBCT, 25th Inf. Div., "The bridge is funded by the Iraqi government, a local company is doing all of the work, and the Iraqi army is here for security."
The project is separated into two phases; each phase is scheduled for completion in three months. During the first phase the contractors are working to repair the hole in the northbound lane and break down the fallen span to remove it from the canal piece by piece.
During the second phase they will focus completely on rebuilding the missing portion of the bridge in the southbound lane.
The workers began construction June 29, 2008, and have made a good amount of progress preparing foot paths, insuring the safety of the foundation and removing asphalt around the damaged area to begin installing the steel received last week.
The steel portion of the bridge is on schedule to be finished in less then two weeks and from there the workers will move onto pouring the concrete, which should take a total of 28 days.
"By the end of the year the bridge will look like it used to," said Gillman
Each time a vehicle crosses the bridge, it passes a bold sign that can't be missed by the passengers inside. Printed in Arabic the sign screams the words "We will rebuild."
"Seeing this project gives the people of Iraq confidence in themselves and their government. It gives them hope for the future," said Saleem Abdul Karim, bicultural and bilingual advisor who works with the civil engineers and is a subject matter expert in engineering. "It is a light at the end of a tunnel."
Control Panel
|
Get More From DVIDS
Contact a DVIDS Media Specialist to access breaking news stories and photos from the front lines.
File a Media Request >>
DVIDS For Families
Military family members: you can download video and photos of your deployed family members for free!
Learn How Here! >>
News Tags
Sorry, no tags for this item
Related Stories
The early morning sun had already risen enough to bring the temperature to 88 degrees.
10.23.09, Story by Rodney Jackson
The Indian army's 31st Armor Division led an improvised explosive device workshop and a demonstration that familiarized its personnel and 2nd squadron, 14th Cavalry Regiment, "Strykehorse," 2nd Stryker Brigade Combat Team, 25th Infantry Division's personnel with different types of IEDs and equipment to counter IEDs during Exercise Yudh Abhyas here Oct. 19.
10.19.09, Story by Rodney Jackson
From the bottom of a hill, Indian army soldiers and U.S. Soldiers charged up to its crest, shooting and working their way together towards a common target at the top. Their positions covered by suppressive fire from two Stryker vehicles.
10.16.09, Story by Crista Yazzie
Similarities and a common effort became apparent to participants of Yudh Abhyas 09 once the U.S. and Indian armies began their training for the annual bilateral field training exercise – both on and off the field.
10.15.09, Story by Crista Yazzie
A Combat Repair Team from Company B, 225th Brigade Support Battalion attached to 2nd Squadron, 14th Cavalry Regiment, "Strykehorse," 2nd Stryker Brigade Combat Team, 25th Infantry Division is to perform maintenance operations, together with the Indian army's 31st Armor Division mobile repair team, during Exercise Yudh Abhyas here Oct. 13-29.
10.15.09, Story by Rodney Jackson
Today's Top Stories
02.08.10, Story by Fred Baker
02.07.10, Courtesy Story
02.06.10, Courtesy Story
02.05.10, Courtesy Story
02.03.10, Story by Sgt. Tracy J. Smith
02.02.10, Story by Capt. Tony Wickman
02.01.10, Courtesy Story
01.29.10, Story by Donna Miles
01.28.10, Courtesy Story
01.26.10, Story by Spc. Shantelle Campbell
|