(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Engineers Overcome Challenges to Build Electricity Substation

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows a large electrical substation under construction in an arid, desert-like environment. Multiple high-voltage transmission towers and steel lattice structures are visible across a wide, flat sandy terrain. Several workers in blue uniforms are present on-site, with construction materials including cable reels and stacked concrete slabs scattered around.

    AMARAH, IRAQ

    01.22.2008

    Courtesy Photo

    Office of the Secretary of War Public Affairs           

    Circuits come together and split to different directions in the country at the Amarah, Iraq, electrical substation outdoor switchyard.

    IMAGE INFO

    Date Taken: 01.22.2008
    Date Posted: 07.16.2011 07:35
    Photo ID: 73838
    Resolution: 731x548
    Size: 116.2 KB
    Location: AMARAH, IQ

    Web Views: 276
    Downloads: 24

    PUBLIC DOMAIN