WEBVTT

00:00.000 --> 00:02.500
Today to discuss the army's fiscal year

00:02.500 --> 00:05.380
24 budget request . The honorable Gabe

00:05.380 --> 00:07.560
Camarillo , undersecretary of the army

00:07.570 --> 00:09.626
and Major General Mark Bennett , the

00:09.626 --> 00:11.459
director of the army budget will

00:11.459 --> 00:13.570
provide you with an in depth overview

00:13.570 --> 00:15.737
and then take a few questions . Please

00:15.737 --> 00:17.792
hold all questions until the end and

00:17.792 --> 00:19.626
until called upon to give us the

00:19.626 --> 00:21.848
opportunity to get to microphone to you

00:21.848 --> 00:23.737
before asking for transcription .

00:23.737 --> 00:25.792
Please also state your name and your

00:25.792 --> 00:27.959
news organization uh for the time that

00:27.959 --> 00:30.237
we have , please limit to one question .

00:30.237 --> 00:32.070
Um and we will also hold a media

00:32.070 --> 00:34.126
roundtable for any questions that we

00:34.126 --> 00:36.403
don't get to on this topic on Thursday ,

00:36.403 --> 00:38.570
March 16 . Well , well , you will have

00:38.570 --> 00:38.410
the opportunity to ask additional

00:38.410 --> 00:40.620
questions . We have 40 minutes total

00:40.620 --> 00:42.842
for today's event . And gentlemen , the

00:42.842 --> 00:45.120
floor is yours . Well , good afternoon ,

00:45.120 --> 00:47.231
everyone . It's great to be here with

00:47.231 --> 00:49.342
all of you . I'm Gabe Camarillo , the

00:49.342 --> 00:51.398
undersecretary of the army . And for

00:51.398 --> 00:51.180
the second straight year in a row , I

00:51.180 --> 00:53.180
get to do this rollout presentation

00:53.180 --> 00:55.450
with Major General Mark Bennett , our

00:55.450 --> 00:58.050
director of the army Budget office . So

00:58.050 --> 00:59.939
if you can go to the next slide ,

00:59.939 --> 01:02.460
please , we're very pleased to be able

01:02.460 --> 01:04.920
to roll out the fy 24 budget submission

01:04.930 --> 01:07.200
which enables us to continue to

01:07.210 --> 01:09.432
implement our national defense strategy

01:09.432 --> 01:12.480
with a top line of 100 and 85 billion

01:12.490 --> 01:15.820
overall for the army . The budget

01:15.820 --> 01:18.042
submission enables us to do a couple of

01:18.042 --> 01:20.042
different things at the same time .

01:20.042 --> 01:22.098
First , we continue to implement the

01:22.098 --> 01:24.264
NDS and transform the army to meet the

01:24.264 --> 01:26.487
demands and requirements of large scale

01:26.487 --> 01:28.653
combat operations and a shift to multi

01:28.653 --> 01:30.876
domain operations . And it also enables

01:30.876 --> 01:32.876
us to maintain a budget that's very

01:32.876 --> 01:34.876
much driven by our strategy and the

01:34.876 --> 01:36.931
priority set out by Secretary Austin

01:36.931 --> 01:39.098
and Secretary of War meth . So first ,

01:39.098 --> 01:41.264
I point out on this point , people are

01:41.264 --> 01:43.598
our top priority and our greatest asset .

01:43.598 --> 01:45.487
So we're able to fund significant

01:45.487 --> 01:47.542
investments to address our continued

01:47.542 --> 01:49.710
challenge faced across all of D O D to

01:49.710 --> 01:51.821
meet our recruiting goals and to help

01:51.821 --> 01:53.988
invest in attracting the nation's best

01:53.988 --> 01:55.766
talent to the army . There is a

01:55.766 --> 01:59.020
significant emphasis in soldier housing ,

01:59.030 --> 02:01.308
both in barracks and in family housing ,

02:01.308 --> 02:03.419
significant investments in quality of

02:03.419 --> 02:05.450
life and in access to child care .

02:06.160 --> 02:08.650
Second , there's a key point in terms

02:08.650 --> 02:10.261
of emphasizing readiness and

02:10.261 --> 02:12.483
capabilities , defending the nation and

02:12.483 --> 02:14.483
building deterrence . Uh First , we

02:14.483 --> 02:16.594
fully fund all of our C T C rotations

02:16.594 --> 02:18.706
and flying hours and we invest in key

02:18.706 --> 02:20.928
exercises such as specific pathways and

02:20.928 --> 02:23.094
defender Europe . And then of course ,

02:23.094 --> 02:25.150
we continue a lot of momentum on our

02:25.150 --> 02:27.420
modernization strategy with continued

02:27.420 --> 02:29.531
development and procurement of all of

02:29.531 --> 02:31.753
our major programs while increasing our

02:31.753 --> 02:33.976
overall investment in capabilities that

02:33.976 --> 02:36.087
are relevant to the Indo Pacific long

02:36.087 --> 02:38.031
range fires , air defense and deep

02:38.031 --> 02:40.031
sensing , as well as logistics in a

02:40.031 --> 02:42.087
contested environment . Next slide ,

02:42.087 --> 02:44.530
please . But it turned her over to

02:44.530 --> 02:46.752
General Bennett . Thank you , honorable

02:46.752 --> 02:48.919
Camarillo . Good afternoon . I'm major

02:48.919 --> 02:51.030
General Mark Bennett and I am honored

02:51.030 --> 02:53.252
to serve as the army's 32nd director of

02:53.252 --> 02:55.419
the army budget . This slide shows the

02:55.419 --> 02:57.474
comparison between last year's fy 23

02:57.474 --> 02:59.308
presidents budget request to the

02:59.308 --> 03:01.641
current fy 24 presidents budget request .

03:01.641 --> 03:03.808
The 24 request resources , the army to

03:03.808 --> 03:06.090
train , operate , sustain and modernize

03:06.090 --> 03:09.440
the force . The army's fy 24 base

03:09.440 --> 03:12.370
budget request is $185.5 billion an

03:12.370 --> 03:14.426
increase of roughly $8 billion above

03:14.426 --> 03:16.750
our 23 request . This total reflects

03:16.750 --> 03:18.917
the combined resource requirements for

03:18.917 --> 03:21.220
all three components , active U S Army

03:21.220 --> 03:23.442
Reserve and the Army National Guard and

03:23.442 --> 03:25.498
includes overseas operations costs .

03:26.460 --> 03:28.682
Addressing the increases you see within

03:28.682 --> 03:30.738
the R D T any increase . I will note

03:30.738 --> 03:32.682
that 82% of the army's science and

03:32.682 --> 03:34.904
technology budget is aligned to our top

03:34.904 --> 03:36.880
modernization priorities . Two

03:36.880 --> 03:39.102
significant examples of our R D T . Any

03:39.102 --> 03:41.290
investment areas are 24 funding of a

03:41.290 --> 03:43.234
billion dollars for the long range

03:43.234 --> 03:45.068
hypersonic weapon to support the

03:45.068 --> 03:47.179
further development and demonstration

03:47.179 --> 03:49.123
of the prototype battery that will

03:49.123 --> 03:51.234
provide the army , a strategic attack

03:51.234 --> 03:53.234
weapon system to defeat anti access

03:53.234 --> 03:55.457
area denial capabilities . There's also

03:55.457 --> 03:57.679
optional man fighting vehicle RDT , any

03:57.679 --> 03:59.790
funding of nearly a billion dollars ,

03:59.790 --> 04:01.790
$997 million dollars to support the

04:01.790 --> 04:03.679
maturation of detailed design and

04:03.679 --> 04:05.346
prototyping phases . With the

04:05.346 --> 04:08.320
competition increased procurement

04:08.510 --> 04:10.288
includes critical munitions for

04:10.288 --> 04:12.121
combatant commanders such as the

04:12.121 --> 04:13.970
precision strike missile at $584

04:13.970 --> 04:16.192
million and the patriot missile segment

04:16.192 --> 04:18.192
enhanced missiles of $1.2 billion .

04:18.310 --> 04:20.366
Other modernization priority efforts

04:20.366 --> 04:22.254
include the armored multi purpose

04:22.254 --> 04:24.460
vehicle at $555 million mobile

04:24.460 --> 04:27.580
protected firepower , $395 million and

04:27.580 --> 04:29.636
the next generation squad weapon for

04:29.636 --> 04:32.470
$293 million . The army continues as

04:32.470 --> 04:34.637
well to invest in upgrading industrial

04:34.637 --> 04:36.748
base facilities with over 1.5 billion

04:36.748 --> 04:38.803
to meet the requirements of upcoming

04:38.803 --> 04:40.526
next generation ammunition and

04:40.526 --> 04:42.137
equipment Increased military

04:42.137 --> 04:44.137
construction funding addresses Army

04:44.137 --> 04:46.026
Senior leadership's commitment to

04:46.026 --> 04:48.137
soldier housing and barracks which we

04:48.137 --> 04:50.137
will talk more about later . Lastly

04:50.137 --> 04:52.248
included in this budget is a 5.2% pay

04:52.248 --> 04:54.192
raise , which is the highest in 20

04:54.192 --> 04:56.137
years for our military and for our

04:56.137 --> 04:58.610
civilian employees . 40 years increases

04:58.610 --> 05:00.777
for housing and subsistence allowances

05:00.777 --> 05:02.999
for our soldiers and their families are

05:02.999 --> 05:05.166
included as well . Honorable Camarillo

05:05.166 --> 05:07.054
back to you . Thanks next slide ,

05:07.054 --> 05:08.999
please . So just briefly wanted to

05:08.999 --> 05:10.943
highlight as the army continues to

05:10.943 --> 05:13.166
transform to the army of 2030 . Engaged

05:13.166 --> 05:15.277
in multi domain operations as part of

05:15.277 --> 05:17.388
our national defense strategy . There

05:17.388 --> 05:17.340
are a couple of highlights we'd like to

05:17.340 --> 05:19.910
flag as part of the fy 24 budget , you

05:19.910 --> 05:21.577
know , first as our continued

05:21.577 --> 05:23.799
investment in key capabilities that are

05:23.799 --> 05:26.090
ramping up in fy 24 deep sensing ,

05:26.090 --> 05:28.180
significant investments in Titan in

05:28.180 --> 05:30.970
Haiti's 100 and 42 million uh first for

05:30.970 --> 05:33.070
Titan and 100 and 91 million for

05:33.070 --> 05:35.910
Haiti's respectively . Long range fires ,

05:35.920 --> 05:38.087
continued development of our mid range

05:38.087 --> 05:40.031
capability , long range hypersonic

05:40.031 --> 05:42.142
weapon . As general Bennett just said

05:42.142 --> 05:44.142
an increment , one of our precision

05:44.142 --> 05:46.253
strike missile , as well as continued

05:46.253 --> 05:48.309
development of prisms capabilities ,

05:48.309 --> 05:50.531
air defense to protect all of our joint

05:50.531 --> 05:52.531
forces in any theater . Significant

05:52.531 --> 05:54.870
investments in if pick em show rod and

05:54.870 --> 05:57.580
counter us with the latter being 400

05:57.580 --> 05:59.560
million integrated air and missile

05:59.560 --> 06:02.790
defense , 697 million M sure at

06:02.790 --> 06:06.400
590 million and if pick 509 million .

06:07.100 --> 06:08.933
And also don't want to forget to

06:08.933 --> 06:11.044
mention the significant investment in

06:11.044 --> 06:13.156
our major modernization programs like

06:13.156 --> 06:15.378
future vertical lift and combat vehicle

06:15.378 --> 06:17.433
modernization as well as significant

06:17.433 --> 06:19.544
investments as I mentioned earlier in

06:19.544 --> 06:21.767
contested logistics . But how does this

06:21.767 --> 06:23.989
come together ? We develop capabilities

06:23.989 --> 06:26.100
but we field units and formations and

06:26.100 --> 06:27.933
that's how we actually fight and

06:27.933 --> 06:30.044
significant effort and ground will be

06:30.044 --> 06:32.211
covered in fy 24 to include converting

06:32.211 --> 06:34.267
our first multi domain task force to

06:34.267 --> 06:36.489
full design with long range fires are S

06:36.489 --> 06:38.378
Febreze continue efforts to build

06:38.378 --> 06:40.600
partnership capacity around the world ,

06:40.600 --> 06:42.822
the development of watercraft companies

06:42.822 --> 06:44.989
and cyberwarfare detachments to name a

06:44.989 --> 06:46.989
few . And we wanted to also mention

06:46.989 --> 06:49.156
that there is investment within the fy

06:49.156 --> 06:51.267
24 budget to build and develop skills

06:51.267 --> 06:53.156
that we need . Particularly . For

06:53.156 --> 06:55.211
example , data science to access and

06:55.211 --> 06:57.211
unlock data and technical skills to

06:57.211 --> 06:59.433
help us drive interoperability with our

06:59.433 --> 07:01.489
joint sister services , our partners

07:01.489 --> 07:03.830
and our allies . Next slide , please .

07:05.310 --> 07:07.421
So as we said , people are number one

07:07.421 --> 07:09.670
priority . And as we looked ahead and

07:09.670 --> 07:11.559
we talked last year at the budget

07:11.559 --> 07:13.503
rollout about and strength and the

07:13.503 --> 07:15.614
uncertain recruiting environment . We

07:15.614 --> 07:17.726
wanted to flag where we are in the fy

07:17.726 --> 07:20.020
24 budget . Certainly , we did not

07:20.020 --> 07:21.964
choose and nor are we selecting to

07:21.964 --> 07:24.076
choose to reduce the size of the army

07:24.076 --> 07:27.030
in the fy 24 submission . We do plan an

07:27.040 --> 07:28.707
active duty and strength . We

07:28.707 --> 07:30.818
programmed against the requirement of

07:30.818 --> 07:33.990
452,000 , but this really reflects our

07:33.990 --> 07:36.580
desire over the fight up to build our

07:36.580 --> 07:38.191
end strength . But there are

07:38.191 --> 07:40.413
significant uncertainties regarding the

07:40.413 --> 07:42.636
recruiting market . As Secretary warmth

07:42.636 --> 07:44.858
has said in many instances , it did not

07:44.858 --> 07:46.580
take one year to get into this

07:46.580 --> 07:48.747
situation . It will take several years

07:48.747 --> 07:50.913
to get us out of it . We are not alone

07:50.913 --> 07:52.858
across the department and facing a

07:52.858 --> 07:54.913
historic recruiting challenge and we

07:54.913 --> 07:56.913
are pulling a significant number of

07:56.913 --> 07:58.969
levers and undertaking a significant

07:58.969 --> 08:01.024
number of reforms , all of which are

08:01.024 --> 08:03.136
resourced in the FY 24 budget to help

08:03.136 --> 08:05.358
us improve our recruiting performance .

08:05.990 --> 08:08.520
So what we programmed in this budget is

08:08.520 --> 08:10.576
based on our projections of where we

08:10.576 --> 08:12.798
think we will be . But that's two years

08:12.798 --> 08:14.742
from now and there's a significant

08:14.742 --> 08:16.631
amount of uncertainty and we will

08:16.631 --> 08:18.742
continue to update those numbers both

08:18.742 --> 08:20.853
with Congress and our stakeholders as

08:20.853 --> 08:23.131
we continue to get closer to execution .

08:23.131 --> 08:25.187
But I do want to take a moment about

08:25.187 --> 08:27.409
what we're doing in the fy 24 budget as

08:27.409 --> 08:29.464
it relates to recruiting . So we are

08:29.464 --> 08:31.631
fundamentally improving our recruiting

08:31.631 --> 08:33.798
enterprise , which we've begun already

08:33.798 --> 08:35.742
and we continue to fund efforts to

08:35.742 --> 08:37.742
train our recruiters to ensure that

08:37.742 --> 08:39.853
they're placed in those markets where

08:39.853 --> 08:41.853
they can have the greatest impact ,

08:41.853 --> 08:44.020
giving them the best tools , utilizing

08:44.020 --> 08:46.076
incentives like our soldier referral

08:46.076 --> 08:48.760
program , creating targeted incentives

08:48.760 --> 08:51.160
for potential recruits such as a duty

08:51.160 --> 08:53.280
station of choice and our various

08:53.280 --> 08:55.224
recruiting bonuses that we've been

08:55.224 --> 08:56.780
employing since last year .

08:57.360 --> 08:59.027
Communicating with our target

08:59.027 --> 09:01.249
population is a significant part of our

09:01.249 --> 09:02.971
efforts to drive and build our

09:02.971 --> 09:04.916
recruiting performance . And so we

09:04.916 --> 09:06.971
fully fund in the fy 24 budget , our

09:06.971 --> 09:09.082
marketing and advertising efforts and

09:09.082 --> 09:11.340
requirements and we also fund emphasis

09:11.340 --> 09:14.370
in select markets such as key 16 cities

09:14.380 --> 09:15.991
that are gonna help us drive

09:15.991 --> 09:17.991
performance , not only in fy 24 but

09:17.991 --> 09:20.047
also in the year preceding it , that

09:20.047 --> 09:21.991
we're currently executing it . But

09:21.991 --> 09:24.102
again , it will take time . I do want

09:24.102 --> 09:26.324
to emphasize to get there . This is not

09:26.324 --> 09:28.491
going to be done overnight and this is

09:28.491 --> 09:28.380
something that we see happening across

09:28.380 --> 09:30.602
the entire Department of Defense to all

09:30.602 --> 09:32.547
the services . We will continue to

09:32.547 --> 09:34.602
innovate and experiment with ways to

09:34.602 --> 09:36.547
improve our recruiting performance

09:36.547 --> 09:38.380
overall . But this is what we're

09:38.380 --> 09:40.920
funding in the FY 24 budget . Next

09:40.920 --> 09:43.190
slide before I leave that slide , if I

09:43.190 --> 09:45.412
could , I just want to also mention the

09:45.412 --> 09:47.412
future soldier prep course , we are

09:47.412 --> 09:49.746
funding expansion of that . As you know ,

09:49.746 --> 09:51.801
it's going from Fort Jackson to Fort

09:51.801 --> 09:53.968
Benning . We will continue to use that

09:53.968 --> 09:56.190
pilot as a model for a way to invest in

09:56.190 --> 09:58.412
America's youth , whether it's academic

09:58.412 --> 09:58.355
skills or meeting physical standards .

09:58.505 --> 10:00.672
We're finding that there's significant

10:00.672 --> 10:02.685
success in the number of potential

10:02.685 --> 10:04.796
recruits that are graduating from the

10:04.796 --> 10:07.815
program a little bit over 3700 so far

10:07.825 --> 10:09.936
just through Fort Jackson . And as we

10:09.936 --> 10:12.103
expand , it will continue to track the

10:12.103 --> 10:14.325
data on it , but that program is funded

10:14.325 --> 10:17.780
in fy 24 . Next slide , I want to also

10:17.780 --> 10:19.724
emphasize something that Secretary

10:19.724 --> 10:21.613
Warmth has , has pointed out very

10:21.613 --> 10:23.780
publicly is that if we want to be able

10:23.780 --> 10:26.020
to be uh an employer of choice , if we

10:26.020 --> 10:28.187
want to recruit and attract and retain

10:28.187 --> 10:30.409
the nation's best talent , we also need

10:30.409 --> 10:32.353
to make significant investments in

10:32.353 --> 10:34.750
quality of life and in housing , not

10:34.750 --> 10:36.583
just for families , but also for

10:36.583 --> 10:38.750
individual soldiers and barracks . And

10:38.750 --> 10:40.861
so there are , you'll see that in the

10:40.861 --> 10:42.750
slide , it reflects a significant

10:42.750 --> 10:44.917
increase in emphasis in these areas of

10:44.917 --> 10:46.917
investment with five new barracks ,

10:46.917 --> 10:50.505
barracks projects projected in Fy 24 at

10:50.515 --> 10:54.195
287.5 million . And those include

10:54.205 --> 10:56.785
projects at Fort Wainwright Joint Base

10:56.785 --> 10:59.200
Lewis mcchord , two projects at Fort

10:59.200 --> 11:02.320
Bragg and at Soldier Systems , soldier

11:02.320 --> 11:03.820
Systems Center in Natick ,

11:03.820 --> 11:06.153
Massachusetts . And these are of course ,

11:06.153 --> 11:08.209
just the ones that are entering into

11:08.209 --> 11:09.987
the milk on phase , significant

11:09.987 --> 11:12.098
investment in planning and design for

11:12.098 --> 11:14.209
other projects across the portfolio .

11:14.209 --> 11:16.431
It is really part of an overall 10 year

11:16.431 --> 11:18.431
strategy to invest $10 billion over

11:18.431 --> 11:21.310
time to upgrade and address uh you know ,

11:21.310 --> 11:23.477
housing and infrastructure debt across

11:23.477 --> 11:25.532
the army . I'll turn over to general

11:25.532 --> 11:27.754
benefit some more specifics . Thank you

11:27.754 --> 11:29.921
sir . Our family housing program in fy

11:29.921 --> 11:32.032
24 includes two projects at Kwajalein

11:32.032 --> 11:34.143
Atoll and the bomb holder Germany for

11:34.143 --> 11:36.143
100 and $77.3 million as well as to

11:36.143 --> 11:38.254
equity investments at Fort Gordon and

11:38.254 --> 11:40.670
Fort Leonard Wood . Army leadership is

11:40.670 --> 11:42.810
also focused on expanding child care

11:42.810 --> 11:44.977
and there are several initiatives that

11:44.977 --> 11:47.143
are aimed at improving the recruitment

11:47.143 --> 11:49.088
and retention of child care center

11:49.088 --> 11:49.030
providers through an entry level pay

11:49.030 --> 11:51.720
raise increase to $17.34 an hour

11:52.020 --> 11:54.680
providing a 50% employee childcare

11:54.680 --> 11:56.820
discount as well as annual retention

11:56.820 --> 11:59.150
bonuses . The army has also planned to

11:59.150 --> 12:01.094
invest over $200 million in future

12:01.094 --> 12:03.317
child development center facilities and

12:03.317 --> 12:05.317
youth centers over the next several

12:05.317 --> 12:09.220
years . Next slide secretary

12:09.220 --> 12:11.387
warmest , one of our key priorities is

12:11.387 --> 12:13.498
to build positive command climates at

12:13.498 --> 12:15.664
scale , taking care of our people . As

12:15.664 --> 12:17.609
Secretary Austin has said , is our

12:17.609 --> 12:19.776
number one priority and we have done a

12:19.776 --> 12:21.887
lot in the fy 24 budget to be able to

12:21.887 --> 12:24.109
drive that change that we want to see .

12:24.109 --> 12:25.831
First and foremost , continued

12:25.831 --> 12:28.053
investment in strengthening our efforts

12:28.053 --> 12:30.164
to prevent sexual assault anywhere in

12:30.164 --> 12:32.450
the army and to respond to it with $290

12:32.450 --> 12:35.070
million that addresses our ability to

12:35.070 --> 12:37.180
hire prevention expertise across our

12:37.180 --> 12:39.870
installations to help advance our

12:39.880 --> 12:41.790
prevention strategies to prevent

12:41.790 --> 12:43.720
harmful behaviors . And also to

12:43.730 --> 12:45.952
implement some of the reforms that were

12:45.952 --> 12:48.174
legislated by Congress in the N D A and

12:48.174 --> 12:50.008
recommended as part of Secretary

12:50.008 --> 12:52.174
Austin's Independent Review Commission

12:52.174 --> 12:54.286
on sexual assault prevention . So for

12:54.286 --> 12:56.452
example , we're fully implementing the

12:56.452 --> 12:58.674
Office of Special Trial Counsel , which

12:58.674 --> 13:00.508
kicks in at the very end of 2023

13:00.580 --> 13:02.636
suicide prevention measures are also

13:02.636 --> 13:04.802
fully funded in this particular budget

13:04.802 --> 13:06.740
to include expanding access to

13:06.750 --> 13:08.528
behavioral health as much as we

13:08.528 --> 13:11.050
possibly can . To ensure that we're re

13:11.050 --> 13:13.106
sourcing suicide prevention training

13:13.106 --> 13:15.106
for leaders that will help identify

13:15.106 --> 13:17.280
harmful behaviors before they become a

13:17.280 --> 13:20.030
challenge . And then also of course ,

13:20.030 --> 13:22.086
investing in how we're selecting and

13:22.086 --> 13:24.252
building our leaders to make sure that

13:24.252 --> 13:26.910
whether it's the B CAP or C CAP program

13:26.920 --> 13:29.142
to be able to identify the right leader

13:29.142 --> 13:31.476
for the right assignment moving forward .

13:31.476 --> 13:33.642
Also , I'll note there's investment in

13:33.642 --> 13:35.420
M W R to help build some of the

13:35.420 --> 13:37.087
positive command climates and

13:37.087 --> 13:39.040
assistance to help place spouse

13:39.040 --> 13:41.096
employment and address some of those

13:41.096 --> 13:43.373
gaps that we have on our installations .

13:44.090 --> 13:47.910
Next slide , I mentioned very early

13:47.910 --> 13:50.132
on that we fully fund readiness in this

13:50.132 --> 13:52.270
budget R C T C rotations and flying

13:52.270 --> 13:54.326
hours . And I'll let General Bennett

13:54.326 --> 13:56.659
give you some of the specifics . Thanks ,

13:56.659 --> 13:58.603
sir . We plan to conduct 22 combat

13:58.603 --> 14:00.770
training center rotations in fy 20 for

14:00.770 --> 14:02.881
the same number in fy 23 that include

14:02.881 --> 14:04.826
two for the National Guard and two

14:04.826 --> 14:06.714
exportable rotations conducted in

14:06.714 --> 14:08.937
Hawaii and Alaska . Over 100 and 40,000

14:08.937 --> 14:10.770
soldiers will participate in our

14:10.770 --> 14:13.230
worldwide exercise program including 30

14:13.240 --> 14:15.110
and by training , supporting our

14:15.110 --> 14:17.360
campaigning by training and over 100

14:17.360 --> 14:20.090
and 15 exercises including 33 of those

14:20.090 --> 14:22.320
in the Pacific . We will continue to

14:22.320 --> 14:24.610
implement our regionally armed Alliance

14:24.620 --> 14:26.620
readiness and modernization program

14:26.620 --> 14:28.787
which seeks to balance the building of

14:28.787 --> 14:30.731
readiness and modernization of our

14:30.731 --> 14:32.898
formations and supports the transition

14:32.898 --> 14:35.009
to a division centric army . There is

14:35.009 --> 14:37.120
an increase of 14% in funding for our

14:37.120 --> 14:39.342
preposition stocks that get utilized in

14:39.342 --> 14:41.342
our exercises as well as real world

14:41.342 --> 14:43.564
mission support . And there are several

14:43.564 --> 14:45.731
facilities projects aimed at improving

14:45.731 --> 14:45.300
our total army readiness with

14:45.300 --> 14:47.522
investments in garden reserve readiness

14:47.522 --> 14:49.467
centers , maintenance facilities ,

14:49.467 --> 14:51.633
instructional facilities and water and

14:51.633 --> 14:53.890
utilities in Hawaii . Next slide ,

14:53.890 --> 14:56.830
please . So I talked earlier about

14:56.830 --> 14:59.020
significant continuity year over year

14:59.030 --> 15:01.141
in our modernization strategy . And I

15:01.141 --> 15:03.363
think you'll see that once you read the

15:03.363 --> 15:05.641
details of our Fy 24 budget submission ,

15:05.641 --> 15:08.150
I'd like to note that we are delivering

15:08.150 --> 15:10.317
and , and continuing to build momentum

15:10.317 --> 15:12.410
on our programs to include several I

15:12.410 --> 15:14.660
point out here . First unit equipped

15:14.670 --> 15:16.670
for mid range capability is planned

15:16.670 --> 15:19.470
within fy 20 for delivery of counter

15:19.470 --> 15:21.910
small U S M lids prototypes in the

15:21.910 --> 15:24.900
third quarter , prism increment one

15:24.910 --> 15:26.800
continuing to develop to deliver

15:26.800 --> 15:28.967
prototypes in the fourth quarter of Fy

15:28.967 --> 15:31.720
24 army integrated air and missile

15:31.720 --> 15:34.740
defense fielding in the 1st 1st half of

15:34.740 --> 15:38.010
the year in Fy 24 as well as the next

15:38.010 --> 15:40.232
generation squad weapon with first unit

15:40.232 --> 15:42.454
equipped in the second quarter of Fy 20

15:42.454 --> 15:44.450
for all , demonstrate that we're

15:44.450 --> 15:46.860
continuing to build significant

15:46.870 --> 15:49.980
momentum in this particular effort . Uh

15:49.990 --> 15:52.430
there are procurement quantities of

15:52.430 --> 15:54.486
note in this particular budget as we

15:54.486 --> 15:56.708
continue to invest in programs that are

15:56.708 --> 15:59.460
in full rate to include and be 191 in

15:59.460 --> 16:03.310
terms of the quantity JLTV

16:03.310 --> 16:05.421
1753 . And then of course , continued

16:05.421 --> 16:07.477
procurement of PAC three in terms of

16:07.477 --> 16:10.990
size 230 that fully make use of our

16:10.990 --> 16:13.420
investments and production capacity in

16:13.420 --> 16:15.420
the industrial base , significant

16:15.420 --> 16:17.476
quantities for a whole host of other

16:17.476 --> 16:19.531
programs , all of which I won't list

16:19.531 --> 16:21.642
here , but I will say that across the

16:21.642 --> 16:23.420
board over fy 20 three's budget

16:23.420 --> 16:25.420
submission , you see an increase in

16:25.420 --> 16:27.587
investor R D T and E and procurement .

16:27.587 --> 16:29.698
I'll turn over to General Bennett for

16:29.698 --> 16:31.920
some more details . I'll talk some more

16:31.920 --> 16:30.955
on the program investments which

16:30.955 --> 16:33.177
include developing a resilient tactical

16:33.177 --> 16:36.405
network that includes 13,701 H M S

16:36.405 --> 16:40.220
radios consisting of 5465 of the leader

16:40.330 --> 16:43.320
and 8236 of the man pack variants .

16:43.600 --> 16:45.322
This also addresses are crypto

16:45.322 --> 16:47.322
requirements . We're gonna purchase

16:47.322 --> 16:50.520
34,221 low cost tactical radio

16:50.520 --> 16:52.687
replacements which replaces our cigars

16:52.687 --> 16:56.470
system as well as 2,241 high frequency

16:56.470 --> 16:59.210
radios . Lastly , the mobile protected

16:59.210 --> 17:01.760
firepower for the second lot of 33 low

17:01.760 --> 17:03.927
rate initial production vehicles which

17:03.927 --> 17:05.982
will provide two company sets of mps

17:05.982 --> 17:08.390
for fielding next slide , please .

17:10.400 --> 17:12.511
So it's no secret that is part of our

17:12.511 --> 17:14.678
national defense strategy . The pacing

17:14.678 --> 17:16.900
challenge is in the Indo Pacific region

17:16.900 --> 17:19.067
and we wanted to highlight some of the

17:19.067 --> 17:21.011
significant investments that we're

17:21.011 --> 17:23.122
making in our fy 24 budget submission

17:23.122 --> 17:24.900
that are aligned to that pacing

17:24.900 --> 17:26.900
challenge . As Secretary Warmth has

17:26.900 --> 17:29.620
also said in many cases , were , were

17:29.620 --> 17:31.731
fully funding our efforts to do three

17:31.731 --> 17:33.980
things in the Pacific first . It's to

17:33.980 --> 17:36.091
build deterrence as part of the joint

17:36.091 --> 17:37.924
force and we're supporting those

17:37.924 --> 17:40.170
efforts to build capability and

17:40.170 --> 17:42.281
partnerships with allies and partners

17:42.281 --> 17:44.503
throughout the throughout the region to

17:44.503 --> 17:46.503
include investments in our security

17:46.503 --> 17:48.614
force assistance brigades . The train

17:48.614 --> 17:50.726
with over 12 countries in the Pacific

17:50.726 --> 17:52.781
this last year and fully funding our

17:52.781 --> 17:55.110
exercises like Pacific pathways and

17:55.120 --> 17:57.600
development of the J P M R C for

17:57.600 --> 18:00.190
coalition based training both in Hawaii

18:00.190 --> 18:03.050
and Alaska as the Linchpin Force as

18:03.050 --> 18:05.328
part of the joint force in the Pacific .

18:05.328 --> 18:07.217
We are supporting the joint force

18:07.217 --> 18:09.383
ability to establish potential hubs of

18:09.383 --> 18:11.494
operation in the region and defending

18:11.494 --> 18:13.550
it through investments in integrated

18:13.550 --> 18:15.772
air and missile defense such as patriot

18:15.772 --> 18:18.160
if pick and others . Secondly , we're

18:18.160 --> 18:20.327
enabling ground based long range fires

18:20.327 --> 18:22.327
and deep sensing capabilities to go

18:22.327 --> 18:24.271
with it . As part of the Pacific .

18:24.271 --> 18:26.438
You'll see a significant investment in

18:26.438 --> 18:28.549
the fy 24 budget related to that . As

18:28.549 --> 18:30.327
General Bennett has pointed out

18:30.327 --> 18:32.438
significant investments in long range

18:32.438 --> 18:34.382
hypersonic weapons , the continued

18:34.382 --> 18:36.549
fielding of R M R C capability and the

18:36.549 --> 18:38.520
ongoing development of our prism

18:38.530 --> 18:41.000
precision strike missile capability as

18:41.000 --> 18:44.010
well . And then third , sustaining the

18:44.010 --> 18:46.300
force through contested logistics in

18:46.300 --> 18:48.411
this particular area . So what you'll

18:48.411 --> 18:50.710
see in the fy 24 budget includes

18:50.720 --> 18:52.942
investment in watercraft to include the

18:52.942 --> 18:54.942
maneuver support vessel , light and

18:54.942 --> 18:57.290
heavy , various enablers to support

18:57.290 --> 18:59.457
contested logistics operations such as

18:59.457 --> 19:01.568
fuel distribution and storage systems

19:01.568 --> 19:03.590
and other investments in army

19:03.590 --> 19:05.701
preposition stock alternative General

19:05.701 --> 19:07.990
Bennett for any other detail . I would

19:07.990 --> 19:09.950
note that the 33 exercises in The

19:09.950 --> 19:12.061
Pacific are the highest number of the

19:12.061 --> 19:15.180
army's total program in fy 24 of 115

19:15.180 --> 19:18.080
programs . Um I'll also note the L

19:18.080 --> 19:21.200
TIMES investment of 100 I'm sorry ,

19:21.200 --> 19:24.530
$384 million to provide three

19:24.530 --> 19:27.580
sensors . Sir . Back to you , please .

19:28.980 --> 19:31.147
As we all saw last year with the acute

19:31.147 --> 19:33.202
threat of Russian aggression and the

19:33.202 --> 19:35.410
invasion of Ukraine . Obviously , this

19:35.410 --> 19:37.680
tremendous support for the Ukrainians

19:37.690 --> 19:39.579
through drawdown assistance . The

19:39.579 --> 19:41.690
administration has made a significant

19:41.690 --> 19:43.746
effort and I'm proud to say that the

19:43.746 --> 19:46.023
army has played a leading role in that .

19:46.023 --> 19:48.134
One of the things that we are working

19:48.134 --> 19:50.246
through , not only in the base budget

19:50.246 --> 19:50.140
but also with Congress to support

19:50.140 --> 19:52.251
through supplementals is investing in

19:52.251 --> 19:54.500
the resupply , particularly the area of

19:54.500 --> 19:56.500
critical munitions . So I wanted to

19:56.500 --> 19:58.611
talk just a little bit about what the

19:58.611 --> 20:00.389
FY 24 budget does . You know in

20:00.389 --> 20:02.611
addition to the supplementals which are

20:02.611 --> 20:04.722
not part of the fy 24 ask obviously ,

20:04.722 --> 20:06.722
and significant investment that has

20:06.722 --> 20:08.889
been made there , not just to buy back

20:08.889 --> 20:10.833
these munitions , but also in many

20:10.833 --> 20:13.000
cases to invest and enhance production

20:13.000 --> 20:15.167
capacity in the industrial base , were

20:15.167 --> 20:17.222
able to take advantage of that as we

20:17.222 --> 20:19.389
put together the fy 24 budget . So for

20:19.389 --> 20:21.222
example , you'll see significant

20:21.222 --> 20:23.278
investment in procurement of patriot

20:23.278 --> 20:25.500
and Tomahawk missile quantities , fully

20:25.500 --> 20:27.667
taking advantage over time investments

20:27.667 --> 20:29.556
that have been made in production

20:29.556 --> 20:31.389
capacity . Gim Lear's is another

20:31.389 --> 20:33.444
example with 942 million in the base

20:33.444 --> 20:36.340
budget , 155 ammo ,

20:36.350 --> 20:39.600
221 million just in the base budget

20:39.600 --> 20:41.433
alone , that will be paired with

20:41.433 --> 20:43.656
additional funds that were used or that

20:43.656 --> 20:45.989
were appropriated through supplementals .

20:45.989 --> 20:48.044
And then of course , next generation

20:48.044 --> 20:50.156
squad weapon ammunition , 191 million

20:50.360 --> 20:52.930
we are pursuing as part of the

20:52.940 --> 20:55.190
department wide effort , enhanced

20:55.190 --> 20:57.870
multiyear procurement authority uh in

20:57.870 --> 21:00.970
fy 24 on selected programs . At this

21:00.970 --> 21:03.137
point , we are not prepared to be able

21:03.137 --> 21:05.248
to identify which ones they are , but

21:05.248 --> 21:07.359
we are working our way through that .

21:07.359 --> 21:09.470
And certainly we hope to have more on

21:09.470 --> 21:11.470
that as we are able to work through

21:11.470 --> 21:13.581
those that particular process . But I

21:13.581 --> 21:15.820
would note also that fy 24 base budget

21:15.830 --> 21:18.380
also includes significant investment in

21:18.380 --> 21:20.380
the organic industrial base . Now ,

21:20.380 --> 21:22.102
some of this was funded in the

21:22.102 --> 21:24.970
supplementals in Fy 22 Fy 23 . But in

21:24.970 --> 21:27.192
addition , we do have money in the base

21:27.192 --> 21:29.359
budget because we were able to develop

21:29.359 --> 21:31.760
before the Ukrainian invasion . A long

21:31.760 --> 21:34.660
term 10 year organic industrial base

21:34.670 --> 21:37.090
modernization strategy by which we were

21:37.090 --> 21:39.200
able to pull projects forward . When

21:39.200 --> 21:41.478
some were funded from the supplemental .

21:41.478 --> 21:43.589
We had the next wave of projects that

21:43.589 --> 21:45.700
will drive production capacity Across

21:45.700 --> 21:47.589
the industrial base , ready to be

21:47.589 --> 21:49.478
funded into the base budget . And

21:49.478 --> 21:51.589
you'll see here , it's 1.5 billion in

21:51.589 --> 21:53.756
the FY 24 base that goes towards those

21:53.756 --> 21:55.533
investments taken together with

21:55.533 --> 21:57.867
significant help with the supplementals .

21:57.867 --> 21:59.922
We see that we are driving long-term

21:59.922 --> 22:01.922
stability , predictability and most

22:01.922 --> 22:04.089
importantly capacity in the industrial

22:04.089 --> 22:07.480
base over time . You know ,

22:08.920 --> 22:11.820
the next one , next slide is a key

22:11.820 --> 22:13.760
issue in terms of army digital

22:13.760 --> 22:16.220
transformation . There's no secret that

22:16.220 --> 22:18.331
if we're going to be able to fight to

22:18.331 --> 22:20.498
perform multi domain operations and to

22:20.498 --> 22:22.720
execute the national defense strategy ,

22:22.720 --> 22:24.720
we have to be able to unlock data ,

22:24.720 --> 22:26.942
ensure that we have the right skills in

22:26.942 --> 22:29.164
place and to develop the right tools at

22:29.164 --> 22:31.053
the at the pace that we need them

22:31.053 --> 22:32.942
moving forward . There has been a

22:32.942 --> 22:35.164
concerted effort over this last year to

22:35.164 --> 22:37.331
relook our entire network spend across

22:37.331 --> 22:39.664
the army through a series of capability ,

22:39.664 --> 22:41.776
portfolio reviews . And what that did

22:41.776 --> 22:43.720
was allow us to align our FY20 for

22:43.720 --> 22:45.887
investments in a way that will help us

22:45.887 --> 22:48.109
to achieve foundational gains to enable

22:48.109 --> 22:49.720
us to accelerate our digital

22:49.720 --> 22:51.776
transformation . That includes , for

22:51.776 --> 22:53.998
example , key investments in zero trust

22:53.998 --> 22:56.550
implementation of 439 million in a much

22:56.550 --> 22:58.520
more concerted way to be able to

22:58.530 --> 23:00.641
effectuate the department strategy to

23:00.641 --> 23:02.863
get at zero trust and higher security ,

23:03.120 --> 23:05.930
unlocking data , significant investment

23:05.940 --> 23:08.240
in the cloud , our transition to cloud

23:08.240 --> 23:10.462
for certain key applications as well as

23:10.462 --> 23:12.684
efforts to unlock our data through data

23:12.684 --> 23:15.560
platforms , upgrading user experience .

23:15.570 --> 23:17.681
We've all heard about fix my computer

23:17.790 --> 23:20.050
and there is in the fy 24 budget ,

23:20.060 --> 23:22.080
significant investment in order to

23:22.080 --> 23:23.810
retire technical debt that has

23:23.810 --> 23:26.160
accumulated over many years across the

23:26.160 --> 23:28.430
D O D , but certainly within the army

23:28.600 --> 23:30.850
to upgrade user experience and also

23:30.850 --> 23:33.017
experiment with pilots that might make

23:33.017 --> 23:35.410
it easier for soldiers and civilians in

23:35.410 --> 23:37.466
the army to be able to use the right

23:37.466 --> 23:39.250
tools in a way that that's very

23:39.250 --> 23:41.194
effective for them . And to that I

23:41.194 --> 23:43.306
would mention is bring the bring your

23:43.306 --> 23:45.139
own device pilot and the virtual

23:45.139 --> 23:47.680
desktop interface . Secondly , I point

23:47.680 --> 23:49.902
out that we continue to experiment with

23:49.902 --> 23:51.902
artificial intelligence and machine

23:51.902 --> 23:53.680
learning uh in our war fighting

23:53.680 --> 23:55.402
capabilities as also on on our

23:55.402 --> 23:57.960
enterprise side in how we do business

23:57.960 --> 24:00.960
and back office operations . 283

24:00.960 --> 24:02.820
million of investment in this

24:02.820 --> 24:05.380
particular area , significant

24:05.380 --> 24:08.210
investment , 639 million in crypto

24:08.210 --> 24:09.932
modernization , compliance and

24:09.932 --> 24:11.877
modernization to ensure that we're

24:11.877 --> 24:14.099
fully compliant with EN ESA standards .

24:14.430 --> 24:16.541
And then of course , there are funded

24:16.541 --> 24:18.763
investments to upscale our workforce to

24:18.763 --> 24:21.097
bring in software development expertise ,

24:21.097 --> 24:23.152
uh cyber expertise within the army .

24:23.190 --> 24:25.412
And to ensure that we've got people who

24:25.412 --> 24:27.523
have an understanding of the types of

24:27.523 --> 24:29.690
best practices that industry employees

24:29.690 --> 24:31.857
to help us steer and guide our efforts

24:31.857 --> 24:35.630
within the army . Next slide , turn

24:35.630 --> 24:38.800
back over to General Bennett . This

24:38.800 --> 24:41.170
chart list select procurement programs

24:41.170 --> 24:43.392
and they requested quantities highlight

24:43.392 --> 24:45.503
a few programs or items that were not

24:45.503 --> 24:47.503
mentioned before . Um The precision

24:47.503 --> 24:49.726
strike munition double investment there

24:49.726 --> 24:51.670
of 384 million in the missiles for

24:51.670 --> 24:53.781
procuring 100 and 10 of those as well

24:53.781 --> 24:55.892
as 273 million and continued research

24:55.892 --> 24:57.670
development and , and technical

24:57.670 --> 24:59.790
evaluation . Our procurement of two

24:59.790 --> 25:02.410
launchers and 58 new block five

25:02.410 --> 25:04.466
tactical tomahawks for our mid range

25:04.466 --> 25:06.632
capability system . And along with the

25:06.632 --> 25:08.854
list of N G S W rifles that will enable

25:08.854 --> 25:10.966
the field into two B C T s . In Fy 24

25:10.966 --> 25:12.910
we do plan to procure 100 and five

25:12.910 --> 25:15.100
million rounds for the four N G S W

25:15.100 --> 25:18.180
ammo variants . Next is our facilities .

25:22.010 --> 25:24.177
The army's facilities , infrastructure

25:24.177 --> 25:26.454
is a critical aspect of army readiness .

25:26.454 --> 25:28.454
We spoke with you earlier about our

25:28.454 --> 25:30.510
several efforts aimed to improve our

25:30.510 --> 25:32.732
barracks and family housing Provided to

25:32.732 --> 25:34.899
our soldiers and families . The Army's

25:34.899 --> 25:34.810
FY 20 for military construction and

25:34.810 --> 25:36.643
family housing budget request is

25:36.643 --> 25:38.477
roughly 900 million above the 23

25:38.477 --> 25:41.100
request . However , the 23 enacted

25:41.100 --> 25:42.933
level includes over a billion in

25:42.933 --> 25:45.156
additional one time project funding and

25:45.156 --> 25:47.378
over 868 million additional funding for

25:47.378 --> 25:49.600
rising costs of complete expenses . The

25:49.600 --> 25:51.711
army is experiencing and appreciative

25:51.711 --> 25:53.878
of the Congress's support . The army's

25:53.878 --> 25:55.767
24 milk on request of 2.8 billion

25:55.767 --> 25:57.822
addresses , family housing readiness

25:57.822 --> 25:59.989
and modernization needs to include the

25:59.989 --> 25:59.980
287 million we mentioned for the five

25:59.980 --> 26:02.840
barracks , 100 and 97 million for eight

26:02.840 --> 26:04.951
readiness centers , seven of those in

26:04.951 --> 26:07.007
the National Guard , one in the Army

26:07.007 --> 26:09.400
Reserve . 95 million for five Army

26:09.410 --> 26:11.354
Reserve National Guard maintenance

26:11.354 --> 26:13.490
facilities . 100 and 32 million for

26:13.490 --> 26:15.712
five range improvements . Four of those

26:15.712 --> 26:17.768
in the active component , one at the

26:17.768 --> 26:20.700
National Guard , 100 and 63 million for

26:20.700 --> 26:22.867
a state of the art cyber instructional

26:22.867 --> 26:25.660
classroom facility at Fort Gordon . 56

26:25.660 --> 26:28.080
million for 303 100,000 gallon water

26:28.080 --> 26:30.570
storage tank at the Alley Manu military

26:30.570 --> 26:33.730
reservation in Hawaii . And 305 million

26:33.730 --> 26:35.952
for the family housing projects at bomb

26:35.952 --> 26:38.063
holder and Kwajalein , as well as the

26:38.063 --> 26:39.952
equity investments . Lastly , the

26:39.952 --> 26:41.619
army's BRAC funding request .

26:41.619 --> 26:43.508
Supporters supports environmental

26:43.508 --> 26:45.619
cleanup restoration and conveyance of

26:45.619 --> 26:47.397
excess properties and locations

26:47.397 --> 26:49.619
designated under previous backgrounds .

26:49.619 --> 26:51.452
The roughly 150 million in fy 24

26:51.452 --> 26:53.563
requested funding keeps those planned

26:53.563 --> 26:55.619
cleanup efforts on track . Thank you

26:55.619 --> 26:57.619
and I will now turn it back over to

26:57.619 --> 26:57.230
honorable Camarillo for his closing

26:57.230 --> 26:59.174
comments . I just want to close by

26:59.174 --> 27:01.174
saying that , you know , we're very

27:01.174 --> 27:02.841
pleased with the Fy 24 budget

27:02.841 --> 27:05.008
submission . It enables us , as I said

27:05.008 --> 27:07.290
earlier to continue our momentum on the

27:07.300 --> 27:09.720
modernization programs , fully fund our

27:09.720 --> 27:11.980
efforts to address recruiting and to

27:11.980 --> 27:13.758
effectuate the national defense

27:13.758 --> 27:15.980
strategy . So with that , we're looking

27:15.980 --> 27:19.390
forward to your questions . Okay ,

27:19.400 --> 27:20.956
let's start here . Ashley .

27:27.730 --> 27:30.063
Hi , Ashley Burke with breaking defense .

27:31.470 --> 27:35.390
Okay . Um I wanted to

27:35.390 --> 27:37.800
go back to the multi year . Um You know ,

27:37.800 --> 27:39.911
some buys . Um I understand you don't

27:39.911 --> 27:41.800
want to talk about it but OSD has

27:41.800 --> 27:43.911
already disclosed that it is gamblers

27:43.911 --> 27:46.078
and patriot . And I want to clarify if

27:46.078 --> 27:48.133
that's patriot launcher or munitions

27:48.133 --> 27:50.244
and to see what the sticking point is

27:50.244 --> 27:52.467
for the army , um you know , working to

27:52.467 --> 27:54.578
get the multi years when the navy and

27:54.578 --> 27:56.578
the air force had been able to move

27:56.578 --> 27:58.689
forward with some of theirs . Um When

27:58.689 --> 28:00.800
the , I'm sorry , can you repeat that

28:00.800 --> 28:01.800
last part ?

28:03.210 --> 28:06.380
There's an administrative process to

28:06.380 --> 28:08.602
just get through the paperwork with O M

28:08.602 --> 28:10.269
B and we're in the process of

28:10.269 --> 28:12.491
finalizing that . So I think as soon as

28:12.491 --> 28:14.658
we have a little bit more details , in

28:14.658 --> 28:16.713
terms of all of the exhibits will be

28:16.713 --> 28:18.658
able to share all of that with you

28:20.250 --> 28:21.250
three

28:27.050 --> 28:30.470
if you're dumb . Okay , Jeff ,

28:33.720 --> 28:36.100
Thank you . The budget shows increase

28:36.100 --> 28:38.156
in funding for munitions but when it

28:38.156 --> 28:40.044
comes to give blurs , the army is

28:40.044 --> 28:42.310
purchasing about 1000 less than it did

28:42.320 --> 28:44.900
in fiscal 23 and the army's purchasing

28:44.900 --> 28:47.650
fewer javelins . Does the army expect

28:47.660 --> 28:50.130
that it will need supplementals this in

28:50.130 --> 28:52.200
fiscal 24 to buy more gamblers ,

28:52.200 --> 28:55.260
javelins and other critical munitions .

28:55.430 --> 28:57.430
So the hard constraint that we have

28:57.430 --> 28:59.652
here is production capacity which we're

28:59.652 --> 29:01.319
also investing in through the

29:01.319 --> 29:03.541
supplementals . But the hard ceiling if

29:03.541 --> 29:06.300
you will is what can the vendor produce

29:06.310 --> 29:09.010
year over year ? So that is funded

29:09.010 --> 29:10.899
through a combination of our base

29:10.899 --> 29:13.066
budget and prior yourself Because even

29:13.066 --> 29:15.121
though the money was appropriated as

29:15.121 --> 29:17.343
supplemental , for example , in Fy 23 ,

29:17.343 --> 29:19.399
it will be executed over a couple of

29:19.399 --> 29:19.100
years just given the production

29:19.100 --> 29:20.878
capacity increase . But the key

29:20.878 --> 29:22.989
takeaway for you is we're making full

29:22.989 --> 29:25.044
use of that production capacity year

29:25.044 --> 29:29.010
over year . No , no , no , they're

29:29.010 --> 29:31.121
producing a certain quantity which is

29:31.121 --> 29:33.177
the maximum they can produce . We're

29:33.177 --> 29:35.288
funding up to that quantity through a

29:35.288 --> 29:37.454
combination of either the supplemental

29:37.454 --> 29:39.454
and the base budget . If that makes

29:39.454 --> 29:43.430
sense . John Johnson . Hi , John Judson

29:43.430 --> 29:46.390
with defense news . Um I saw in the big

29:46.390 --> 29:49.430
book here , uh directed energy maneuver ,

29:49.430 --> 29:51.660
short range air defense um the 50

29:51.660 --> 29:53.660
kilowatt on the striker and it says

29:53.660 --> 29:57.290
that uh it funds in fy 20 for delivery

29:57.290 --> 30:00.440
at the end of fy 24 . Um Now I thought

30:00.450 --> 30:02.950
that the 50 kilowatt on a striker was

30:02.950 --> 30:04.950
supposed to be delivered , actually

30:05.800 --> 30:08.022
Should have been delivered maybe by now

30:08.022 --> 30:10.300
to the first platoon to the first unit .

30:10.300 --> 30:12.930
So can you talk about what this means ?

30:12.940 --> 30:15.230
Um are you on track with the 50 kW

30:15.230 --> 30:18.150
striker or has it been delayed for

30:18.150 --> 30:20.317
whatever reason ? Um if you could just

30:20.317 --> 30:22.428
provide a little more clarity on what

30:22.428 --> 30:24.594
all this means here , um I'll let mark

30:24.594 --> 30:26.261
fish it out , but I think the

30:26.261 --> 30:28.317
difference is just the delivery of a

30:28.317 --> 30:30.317
prototype to go into testing versus

30:30.317 --> 30:30.150
kind of issuing with a unit . But I'm

30:30.150 --> 30:32.483
gonna let mark kind of find the numbers .

30:32.570 --> 30:34.737
Yeah , it's um um let's show them to ,

30:34.737 --> 30:36.792
to ensure a d prototypes at Yuma and

30:36.792 --> 30:38.640
testing to more prototypes to be

30:38.640 --> 30:41.200
delivered in 23 as well . So it's not

30:41.200 --> 30:43.367
that the program is delayed . Just got

30:43.367 --> 30:45.533
to go through the testing paces before

30:45.533 --> 30:47.367
it gets fielded . Steve Bannon .

30:49.190 --> 30:51.357
Steve Bannon military dot com . As I'm

30:51.357 --> 30:53.579
looking at your barracks projects and ,

30:53.579 --> 30:55.134
you know , there's a lot of

30:55.134 --> 30:54.920
installations that , that need new

30:54.920 --> 30:57.142
barracks . Understand you can't do them

30:57.142 --> 30:59.364
all at once . But can you talk a little

30:59.364 --> 31:01.531
bit about how you triage that ? Um And

31:01.531 --> 31:03.587
also I'm sure I'm reading it wrong ,

31:03.587 --> 31:03.190
but the book and the slides have

31:03.190 --> 31:04.857
completely different barracks

31:04.857 --> 31:07.023
construction numbers , if you can kind

31:07.023 --> 31:09.190
of clarify that . Sure , I'll let Mark

31:09.190 --> 31:08.900
speak to the numbers . But you know ,

31:08.900 --> 31:11.122
we do have a facilities investment plan

31:11.122 --> 31:13.120
that's basically a one to end list

31:13.130 --> 31:15.186
based on a variety of factors that's

31:15.186 --> 31:17.297
run by the Army Material Command . It

31:17.297 --> 31:19.463
factors in life , health and safety is

31:19.463 --> 31:21.574
obviously our top priorities , age of

31:21.574 --> 31:23.463
the installation , you know , the

31:23.463 --> 31:25.519
number of people that use it a whole

31:25.519 --> 31:24.990
host of factors . You know , there are

31:24.990 --> 31:26.990
environmental conditions where for

31:26.990 --> 31:29.930
example , there are more likelihood of

31:29.940 --> 31:31.829
finding mold , for example , in a

31:31.829 --> 31:33.940
particular barracks facility . So all

31:33.940 --> 31:36.051
of those come into play to allow that

31:36.051 --> 31:38.218
one to endless , to get developed , it

31:38.218 --> 31:40.440
is refined continuously over time . And

31:40.440 --> 31:42.273
as we build our budget , we look

31:42.273 --> 31:44.496
through it as we put together the fy 24

31:44.496 --> 31:46.718
base budget , it's informed by a couple

31:46.718 --> 31:48.829
of different factors first , what was

31:48.829 --> 31:50.773
funded in fy 23 . And there were ,

31:50.773 --> 31:50.430
there were some projects that were

31:50.430 --> 31:52.541
funded in the base budget , some that

31:52.541 --> 31:54.652
were funded through congressional ads

31:54.652 --> 31:56.874
and those are executing . In addition ,

31:56.874 --> 31:58.930
which projects are ready in terms of

31:58.930 --> 32:01.041
shovel readiness because the planning

32:01.041 --> 32:03.374
and Has been done , they're ready to go .

32:03.374 --> 32:03.070
And so I think we look at that subset

32:03.070 --> 32:05.126
to figure out what we can put in the

32:05.126 --> 32:07.237
base budget that's based , you know ,

32:07.237 --> 32:07.070
that's , that's ready to go from that

32:07.070 --> 32:09.181
perspective . So , mark , if you want

32:09.181 --> 32:11.292
to speak to the numbers , yeah , I'll

32:11.292 --> 32:13.514
have to check that . I don't know which

32:13.514 --> 32:13.130
figure referring to in there but our

32:13.130 --> 32:15.560
barracks projects to the 207.5 million

32:15.560 --> 32:18.290
that we spoke of earlier . Yes . Yes .

32:18.290 --> 32:20.346
I'll have to take a look at that and

32:20.346 --> 32:21.846
update that if necessary .

32:23.920 --> 32:27.740
A couple of questions on one . I've s

32:27.750 --> 32:29.770
what's the procurement on R and D

32:29.770 --> 32:33.140
funding ? And two Abrams . Your , your

32:33.140 --> 32:35.330
documentary indicates 34 Abrams to be

32:35.330 --> 32:37.580
upgraded . Do I take this as the

32:37.590 --> 32:39.590
Pentagon's made a decision that the

32:39.590 --> 32:43.230
Ukraine and 1 31 M one A one A two are

32:43.230 --> 32:45.341
going to be basically taken from army

32:45.341 --> 32:47.230
stocks . And these are , these 34

32:47.230 --> 32:50.200
represent 34 of the 31 are buried in

32:50.200 --> 32:52.440
here . So I'm gonna answer your first

32:52.440 --> 32:54.840
question first on the evas and mark and

32:54.840 --> 32:56.930
double check the numbers . It's 1.2

32:56.940 --> 32:59.051
variant that we're buying procurement

32:59.051 --> 33:01.107
quantities because we had bought the

33:01.107 --> 33:03.162
other ones in 23 and he can , he can

33:03.162 --> 33:05.329
add something afterwards . I would not

33:05.329 --> 33:05.160
read anything into the Abrams

33:05.160 --> 33:07.160
procurement quantities that are the

33:07.160 --> 33:09.271
current most modern version . I think

33:09.271 --> 33:11.382
it's a set , a three version that are

33:11.382 --> 33:13.493
in the base budget of fy 24 . We have

33:13.493 --> 33:16.500
not used the Fy 24 budget submission as

33:16.500 --> 33:18.667
a means to indicate how we're going to

33:18.667 --> 33:22.340
source the requirement for Ukraine .

33:22.700 --> 33:24.930
All of the options are being looked at

33:24.930 --> 33:27.041
right now and I think we'll have more

33:27.041 --> 33:28.930
to say whenever it's finalized to

33:28.930 --> 33:30.986
address your specific question for .

33:30.986 --> 33:33.152
I've asked the R D T and the amount of

33:33.152 --> 33:35.263
76 million and the procurement amount

33:35.263 --> 33:37.374
89 million for a total of 100 and $65

33:37.374 --> 33:41.330
million $165 million . You can just say

33:41.330 --> 33:44.900
your news . Thank you , John Harper

33:44.900 --> 33:47.067
with defense scoop . And the documents

33:47.067 --> 33:48.956
is a reference to a remote combat

33:48.956 --> 33:51.067
vehicle . Is that the same thing as a

33:51.067 --> 33:53.122
robotic combat vehicle has just been

33:53.122 --> 33:55.233
kind of rebranded ? And then how much

33:55.233 --> 33:58.080
funding is there in Fy 24 for the R C V ?

33:58.080 --> 33:59.913
And what are your plans for that

33:59.913 --> 34:01.802
program in the next fiscal year ?

34:01.802 --> 34:03.858
There's no brand name change . So it

34:03.858 --> 34:05.969
should be our CV , the robotic combat

34:05.969 --> 34:08.024
vehicle and General Bennett can give

34:08.024 --> 34:09.913
you the numbers . It's 100 and 42

34:09.913 --> 34:11.469
million in R D T and N 24 .

34:16.060 --> 34:18.060
Thank you dear . Could a Rudo media

34:18.060 --> 34:19.949
network ? I have a question about

34:19.949 --> 34:22.170
oversee operation cost us for fiscal

34:22.170 --> 34:25.930
year 2020 for you requested 12.409

34:26.470 --> 34:28.640
For your oversee operation courses ,

34:28.640 --> 34:31.480
which is less than your fiscal year

34:31.480 --> 34:35.300
2023 . Why you requested less money for

34:35.310 --> 34:38.310
your operations in oversee ? Does that

34:38.310 --> 34:40.254
mean the threats of ISIS and other

34:40.254 --> 34:43.660
terrorist group is decreased ? And just

34:43.660 --> 34:45.771
to add to this question , how much of

34:45.771 --> 34:49.340
this 398 million goes to Iraq and how

34:49.340 --> 34:52.770
much of this goes to Syria have to

34:52.770 --> 34:54.937
defer to you on that one ? Okay . So ,

34:54.937 --> 34:57.103
yes , you're correct . Our , our , our

34:57.103 --> 34:59.159
fy 24 requests does go down slightly

34:59.159 --> 35:02.710
and compared to the fy 23 number , um I

35:02.710 --> 35:05.050
will note in there that the decreases

35:05.090 --> 35:07.640
are tied to procurement , which is a

35:07.640 --> 35:09.751
decrease in some of the munitions and

35:09.751 --> 35:11.473
replenishment requirements for

35:11.473 --> 35:13.473
operation , enduring sentinel and a

35:13.473 --> 35:15.196
reduction in base funded E D I

35:15.196 --> 35:17.529
requirements again , base funding there .

35:17.529 --> 35:19.584
Um The um your question around about

35:19.584 --> 35:21.696
the counter Islamic state of Iraq and

35:21.696 --> 35:23.862
Syria training equip front of CTF . Um

35:23.862 --> 35:25.862
that does go down slowly as well to

35:25.862 --> 35:25.570
adequately resource the anticipated

35:25.570 --> 35:27.681
requirements and I'll have to get you

35:27.681 --> 35:29.848
the break between for Iraq and Syria .

35:29.848 --> 35:31.626
I don't have that handy . Now ,

35:36.400 --> 35:38.622
I see that the end strength numbers are

35:38.622 --> 35:40.733
down about another 20,000 soldiers as

35:40.733 --> 35:42.844
compared to last year's request . I'm

35:42.844 --> 35:45.067
aware that the recruiting goal has gone

35:45.067 --> 35:47.289
up about by , by about 5000 . Um , with

35:47.289 --> 35:49.622
the numbers still lowering considerably ,

35:49.622 --> 35:51.844
where is the difference being made up ?

35:51.844 --> 35:51.280
Are we just , even though we have a

35:51.280 --> 35:53.960
hired recruiting goal on the recruit on

35:53.970 --> 35:56.026
the army side , are we getting fewer

35:56.026 --> 35:58.248
folks in there or more people leaving ?

35:58.248 --> 36:00.248
Is the army cutting people from the

36:00.248 --> 36:00.010
ranks to make that number ? And I have

36:00.010 --> 36:01.732
a follow up . No , I think our

36:01.732 --> 36:04.440
retention numbers as we closed Fy 22 as

36:04.440 --> 36:06.496
you're certainly going through Fy 23

36:06.496 --> 36:08.740
show significantly high performance on

36:08.740 --> 36:10.740
retaining our soldiers . I think we

36:10.740 --> 36:12.796
ended last year at 100 and 5% of our

36:12.796 --> 36:14.851
requirement . And we're seeing every

36:14.851 --> 36:17.073
indication that we're doing really well

36:17.073 --> 36:19.184
on the retention side . And as I said

36:19.184 --> 36:21.407
earlier , our , our program in terms of

36:21.407 --> 36:23.629
what we're putting in the fy 24 request

36:23.629 --> 36:25.740
based on where we think we could land

36:25.740 --> 36:27.851
in Fy 24 is our best projection based

36:27.851 --> 36:29.907
on where we currently , where we put

36:29.907 --> 36:31.962
the budget together , which is , you

36:31.962 --> 36:34.296
know , static year over year , you know ,

36:34.296 --> 36:36.407
in the omnibus Fy 23 we ended up with

36:36.407 --> 36:38.420
active duty entrance of 452,000 .

36:38.430 --> 36:40.374
That's what was appropriated . And

36:40.374 --> 36:42.486
that's the number that we're starting

36:42.486 --> 36:44.763
in with Fy 20 four's budget submission .

36:44.763 --> 36:46.930
But there's a lot of uncertainty and I

36:46.930 --> 36:49.152
think there's a lot of time between now

36:49.152 --> 36:51.263
and then . And certainly I think that

36:51.263 --> 36:53.486
as we continue to learn more about what

36:53.486 --> 36:53.340
the long term projections are where

36:53.340 --> 36:55.562
we're gonna land will be able to update

36:55.562 --> 36:57.562
that one following separate program

36:57.562 --> 36:59.562
with the Mexican squad weapon . The

36:59.562 --> 37:01.340
senior officials had previously

37:01.340 --> 37:03.507
announced that they were going to have

37:03.507 --> 37:05.618
that field by first quarter of 20 for

37:05.618 --> 37:05.010
that denounced multiple times

37:05.010 --> 37:07.066
publically . What's the delay to the

37:07.066 --> 37:09.232
second quarter ? We'll have to confirm

37:09.232 --> 37:11.454
whether there is a delay or whether you

37:11.454 --> 37:13.566
know what will confirm that for . You

37:13.566 --> 37:13.080
can get it back to you .

37:18.390 --> 37:20.612
Hi , Brian Epstein with Aviation Week .

37:20.612 --> 37:22.779
I was hoping you could expand a little

37:22.779 --> 37:24.890
bit more on the 1.5 billion for F E L

37:24.890 --> 37:26.834
for advanced aviation , aviation ,

37:26.834 --> 37:28.946
advanced development . Can you talk a

37:28.946 --> 37:28.020
little bit about the schedule for the

37:28.020 --> 37:30.600
six Flora prototypes , the flight

37:30.600 --> 37:32.378
demonstration for Farrah and it

37:32.378 --> 37:34.489
mentions 458 million for far . How do

37:34.489 --> 37:36.544
you see that number progressing over

37:36.544 --> 37:38.711
the fight up ? Okay . I'll mark , I'll

37:38.711 --> 37:38.090
let you start and then I'll jump in .

37:38.100 --> 37:41.940
So the for

37:41.940 --> 37:44.790
the , for the far I'm showing with the

37:44.790 --> 37:46.846
458 million there that's compete for

37:46.846 --> 37:49.068
competitive prototype flight testing in

37:49.068 --> 37:51.300
fy 24 . Um The R D T ND for the floor

37:51.300 --> 37:53.450
is a billion dollars . That's the

37:53.450 --> 37:55.610
analysis stage determined how many uh

37:55.620 --> 37:57.842
projected to be fielded , but not until

37:57.842 --> 38:01.820
2030 . What was your

38:01.820 --> 38:05.810
other question on him ? Well , I

38:05.810 --> 38:07.921
mean , it's fully funded in the fight

38:07.921 --> 38:09.866
up . So I think we're , you know ,

38:09.866 --> 38:11.977
we're still planning to do the flight

38:11.977 --> 38:14.199
demo . It's got more development , more

38:14.199 --> 38:13.930
testing that goes through that and then

38:13.930 --> 38:16.150
it would obviously go into um kind of

38:16.150 --> 38:18.372
the next phase of the program . So it's

38:18.372 --> 38:20.428
fully funded both flora and flora in

38:20.428 --> 38:21.928
this particular fight up ,

38:25.010 --> 38:28.760
ma'am . Hi , I'm

38:28.760 --> 38:31.370
Kamala Abdi reporting for the Daily

38:31.370 --> 38:34.740
Pakistani media outlet . Okay . I have

38:34.740 --> 38:36.670
one question on your recruitment

38:36.670 --> 38:38.948
challenge as , as you were speaking of .

38:38.948 --> 38:40.892
So can you speak a little bit more

38:40.892 --> 38:43.003
about it ? And my specific question ,

38:43.003 --> 38:45.114
do you plan to go big about it ? Like

38:45.114 --> 38:47.560
going on campus and looking around and

38:47.570 --> 38:49.780
motivating them because you know , it

38:49.780 --> 38:52.570
requires a lot of to attract and get

38:52.570 --> 38:55.530
them and you know , uh so can you speak

38:55.530 --> 38:57.530
a little bit more about it ? And my

38:57.530 --> 39:00.020
second question is on Guantanamo Bay ,

39:00.030 --> 39:02.197
like , you know , it's one of the most

39:02.197 --> 39:04.230
critical basis of U S military . So

39:04.230 --> 39:06.230
there I've been there in person and

39:06.230 --> 39:08.397
I've seen the soldier barracks and you

39:08.397 --> 39:10.508
know , town houses and um it's a very

39:10.508 --> 39:14.360
nice base . And so can you speak , how

39:14.370 --> 39:16.310
do you have big plans about the

39:16.310 --> 39:18.421
barracks there ? The soldier barracks

39:18.421 --> 39:20.421
and the housing at Guantanamo Bay ?

39:20.421 --> 39:22.477
Thank you . Well , thank you for the

39:22.477 --> 39:24.810
question . I'll first tackle recruiting ,

39:24.810 --> 39:26.532
as I said earlier . It's not a

39:26.532 --> 39:28.810
challenge that that happened overnight .

39:28.810 --> 39:31.143
I think it took many years to get there .

39:31.143 --> 39:33.254
There's some long term and short term

39:33.254 --> 39:35.421
trends , some of the short term trends

39:35.421 --> 39:35.280
uh you know , our conditions in the

39:35.280 --> 39:37.391
labor market , fierce competition for

39:37.391 --> 39:39.800
talent , lack of access in some cases

39:39.800 --> 39:42.133
to high schools . Uh and then of course ,

39:42.133 --> 39:44.356
you know , there the longer term trends

39:44.356 --> 39:46.578
which are declining propensity to serve

39:46.578 --> 39:48.522
in the military , more broadly not

39:48.522 --> 39:50.578
unique to the army . I think all the

39:50.578 --> 39:52.689
services are feeling that challenge .

39:52.689 --> 39:52.640
In addition to the fact that , you know ,

39:52.640 --> 39:54.584
fewer and fewer of America's youth

39:54.584 --> 39:56.751
population have an un understanding of

39:56.751 --> 39:58.973
the range of career options in military

39:58.973 --> 40:01.140
service . So we're undertaking a broad

40:01.140 --> 40:02.918
effort , not just to retool our

40:02.918 --> 40:04.918
recruiting enterprise , but also to

40:04.918 --> 40:07.084
reintroduce the army and the notion of

40:07.084 --> 40:09.307
military service to the American public

40:09.307 --> 40:11.473
more broadly and to be very honest and

40:11.473 --> 40:13.529
candid , I think we need all of your

40:13.529 --> 40:15.640
help as well to do that . Because the

40:15.640 --> 40:17.862
reality is parents , you know , aunts ,

40:17.862 --> 40:20.029
uncles , grandparents of students that

40:20.029 --> 40:22.140
are coming out of high school in many

40:22.140 --> 40:24.196
ways don't know that if you join the

40:24.196 --> 40:26.307
army , you have an opportunity to get

40:26.307 --> 40:28.584
funds to go to college while you serve .

40:28.584 --> 40:30.807
You have an opportunity to learn skills

40:30.807 --> 40:33.029
in high end , very technical skill sets

40:33.029 --> 40:35.700
to be either a day doctor , lawyer , an

40:35.700 --> 40:38.780
engineer , software developer . You can

40:38.780 --> 40:40.724
even be a veterinarian in the army

40:40.724 --> 40:42.780
interestingly enough . So just about

40:42.780 --> 40:44.613
any career you can think of it's

40:44.613 --> 40:46.669
available to you in the army . So we

40:46.669 --> 40:48.780
are making a concerted effort to make

40:48.780 --> 40:50.724
sure that we're communicating that

40:50.724 --> 40:52.391
message and to talk about the

40:52.391 --> 40:54.502
possibilities and career choices that

40:54.502 --> 40:56.336
exist within the army . But more

40:56.336 --> 40:58.558
broadly , we need to continue that . We

40:58.558 --> 40:58.250
do not think that the recruiting

40:58.250 --> 41:00.361
challenge will go away overnight . We

41:00.361 --> 41:02.583
think it's a multi year challenge , but

41:02.583 --> 41:04.528
it's something we're pulling every

41:04.528 --> 41:06.583
lever we can at our disposal to make

41:06.583 --> 41:08.528
sure that we're addressing it both

41:08.528 --> 41:10.750
internally and externally to the army .

41:10.750 --> 41:12.750
But again , we could use everyone's

41:12.750 --> 41:14.861
help . Your second question had to do

41:14.861 --> 41:16.917
with Guantanamo Bay and barracks and

41:16.917 --> 41:19.139
investment housing there . I was trying

41:19.139 --> 41:21.250
to give General Bennett here a lot of

41:21.250 --> 41:23.361
time to be able to find the numbers ,

41:23.361 --> 41:25.306
but if he doesn't have it , we can

41:25.306 --> 41:24.810
certainly get you any investment

41:24.810 --> 41:26.921
regarding milk on there . Yes , sir .

41:26.921 --> 41:29.143
Thank you know , we share resources and

41:29.143 --> 41:28.980
responsibilities down there in

41:28.980 --> 41:30.820
Guantanamo Bay , permanent type

41:30.820 --> 41:32.820
facilities like you're describing ,

41:32.820 --> 41:34.264
there would be likely the

41:34.264 --> 41:34.160
responsibility the Department of the

41:34.160 --> 41:36.382
Navy . So I recommend you ask them when

41:36.382 --> 41:38.920
they come up . Ladies and gentlemen ,

41:38.920 --> 41:40.976
that's all the time we have for this

41:40.976 --> 41:43.142
briefing . Um As a reminder that we're

41:43.142 --> 41:45.142
going to have a media roundtable on

41:45.142 --> 41:47.309
Thursday , March 16th at three PM . If

41:47.309 --> 41:49.198
you're on the office of the Chief

41:49.198 --> 41:51.309
Public Affairs Destro , um you should

41:51.309 --> 41:53.364
already have that in your inbox from

41:53.364 --> 41:55.420
this morning , but if you don't , um

41:55.420 --> 41:55.090
you can come see me after this briefing

41:55.090 --> 41:57.790
or actually I'll be located to my back

41:57.790 --> 41:59.568
right here that I can take your

41:59.568 --> 42:01.734
information down . So you to clear out

42:01.734 --> 42:03.790
this area for the next briefing . So

42:03.790 --> 42:03.430
thank you very much for your

42:03.430 --> 42:04.210
participation .

