WEBVTT

00:00.340 --> 00:00.760
Mhm

00:04.040 --> 00:06.430
Hot pit refueling is a technique used

00:06.430 --> 00:08.450
to eliminate downtime and increase

00:08.450 --> 00:10.910
reliability . After an aircraft lands

00:10.910 --> 00:13.077
and parks instead of powering down the

00:13.077 --> 00:15.243
engines , the air crew keeps an engine

00:15.243 --> 00:17.243
running while the aircraft is being

00:17.243 --> 00:20.580
refueled . This increases our ability

00:20.580 --> 00:22.636
to generate sorties and minimize the

00:22.636 --> 00:24.691
ground time required to get aircraft

00:24.691 --> 00:27.320
airborne again . The time that a hot

00:27.320 --> 00:30.520
pit will save us with units in place

00:30.530 --> 00:34.180
can be extremely beneficial . The Air

00:34.180 --> 00:36.013
Force understands that it cannot

00:36.013 --> 00:38.180
generate air combat power as it has in

00:38.180 --> 00:40.290
the past . Therefore , hot pitting

00:40.290 --> 00:42.370
provides us and allied forces the

00:42.370 --> 00:44.537
flexibility and maneuverability of air

00:44.537 --> 00:46.648
power to sustain the fight to counter

00:46.648 --> 00:48.648
these threats without returning for

00:48.648 --> 00:48.460
fuel .

