00:00.000 --> 00:03.083
(light techno music)

00:30.564 --> 00:32.038
- [Narrator] The air
fields and pavements branch

00:32.038 --> 00:35.062
at ERDC GSL was tasked
by the U.S. Air Force

00:35.062 --> 00:36.605
Civil Engineer Center to develop

00:36.605 --> 00:39.140
training videos and manuals
for the construction

00:39.140 --> 00:41.279
of vertical takeoff and landing pads,

00:41.279 --> 00:45.061
surfaced with AM-2 airfield matting.

00:45.061 --> 00:47.767
- We teamed with the
expeditionary airfield team

00:47.767 --> 00:48.934
at NAVAIR Lakehurst,

00:48.934 --> 00:50.647
to train eight Airmen on the installation

00:50.647 --> 00:54.035
of AM-2 matting, and the cruciform stakes.

00:54.035 --> 00:57.494
- [Narrator] Am-2 matting
is certified for both F-35B,

00:57.494 --> 01:00.577
and MV-22 Osprey aircraft operations.

01:01.728 --> 01:03.219
The training materials will include

01:03.219 --> 01:06.290
criteria specific to the F-35B operations,

01:06.290 --> 01:07.960
including dimensions, slope,

01:07.960 --> 01:12.563
and gradient requirements for
the VTOL pad, and sub grade.

01:12.563 --> 01:15.043
- Equipment used for the
separate construction included

01:15.043 --> 01:18.336
compactor, motor grader, and skid steer.

01:18.336 --> 01:19.893
And we use tools and equipment,

01:19.893 --> 01:22.310
and the standard AM-2 air force tool kit

01:22.310 --> 01:25.005
for building the pad itself,

01:25.005 --> 01:27.198
to install the matting
and the cruciform stakes.

01:27.198 --> 01:29.935
This equipment included a
carbohydraulic power unit,

01:29.935 --> 01:31.727
hydraulic pavement breaker,

01:31.727 --> 01:35.222
and the cruciform stake driver head.

01:35.222 --> 01:36.936
- [Narrator] AM-2 air field
matting is the primary

01:36.936 --> 01:41.115
air field surfacing used by
the United States military.

01:41.115 --> 01:43.921
Each panel consists of
four interlocking edges

01:43.921 --> 01:46.930
that can be connected to
create a large expanse.

01:46.930 --> 01:49.047
The AM-2 matting must be secured by

01:49.047 --> 01:52.188
universal bench clamps,
and cruciform stakes ,

01:52.188 --> 01:54.778
every 12 feet on the expanse edges.

01:54.778 --> 01:56.076
- And at the end of this effort,

01:56.076 --> 01:57.527
we will have developed training material

01:57.527 --> 01:59.575
that will enable the Air Force to build

01:59.575 --> 02:01.796
and certify the AM-2 landing pad,

02:01.796 --> 02:03.766
as another innovative solution

02:03.766 --> 02:05.841
for supporting modern aircraft.

02:05.841 --> 02:09.174
(quiet soothing music)