WEBVTT

00:07.780 --> 00:12.550
The waters of the your which isunwittingly and more than to

00:12.580 --> 00:13.170
Puerto. Rico.

00:15.550 --> 00:18.910
With heaps that one installationsof over four thousand. Feet.

00:21.930 --> 00:23.440
Do the normal dry season.

00:24.740 --> 00:28.230
The Rupert Michel when scenic withof war will about a lot of

00:28.230 --> 00:29.760
cubic feet% of the

00:31.500 --> 00:34.860
The rainy season begins.

00:35.380 --> 00:36.430
The trend streak.

00:37.000 --> 00:40.040
Can turn into a raging riverthem that there is.

00:42.150 --> 00:45.670
This is due to the steep mountainslopes their we've been sold

00:45.670 --> 00:49.720
medal which causes bring them theriver's watershed rapidly run

00:49.720 --> 00:53.920
all important for today. It's causingextensive flooding and

00:53.920 --> 00:55.730
damage to this around environment.

00:57.210 --> 01:00.820
The ten one point say as untowardfickle flooding resulting in

01:00.820 --> 01:04.100
immense human suffering andmassive property damage.

01:04.910 --> 01:08.090
The soon to be constructed Portugueseday and will provide the

01:08.090 --> 01:11.660
essential protection needed to preventthis catastrophic flooding.

01:13.240 --> 01:16.470
The Portuguese downside lies inthe foothills for from the high

01:16.470 --> 01:20.020
first of the central melvins andthe long plane of the southern

01:20.020 --> 01:24.460
coast on the Portuguese river approximatelyfour miles northwest

01:24.460 --> 01:25.130
of ponce.

01:26.560 --> 01:30.830
That topography of this area is feelingwith steep slopes rising

01:30.830 --> 01:34.680
five to six hundred feet abovethe river with a heavy role of

01:34.680 --> 01:35.680
timber in brock.

01:36.710 --> 01:40.240
The Portuguese down as the finalphase of the Portuguese and

01:40.270 --> 01:44.780
without rivers project authorized bycongress in nineteen eighty six.

01:45.500 --> 01:49.470
The total flood control of watersupply storage project consists

01:49.470 --> 01:54.530
of over nine miles of travels nineteendrop structures to debris

01:54.530 --> 01:59.000
base SMS with control structuresinto dams. This reviewers them

01:59.000 --> 02:00.990
that was completed innineteen ninety two.

02:02.040 --> 02:04.120
And the soon to be constructedPortuguese. Debt.

02:06.950 --> 02:10.530
The Portuguese demos designed asa roller compacted concrete

02:10.760 --> 02:11.720
that Arch their.

02:12.500 --> 02:14.710
With a maximum height oftwo hundred twenty feet.

02:15.230 --> 02:19.240
Of maximum thickness of one of loveof the at the base oppressed

02:19.360 --> 02:23.500
because of thirty five three anda crest linked of twelve hundred

02:23.500 --> 02:24.040
thirty. Three.

02:26.540 --> 02:30.250
At home G Christie's until way onehundred forty three feet wide

02:30.490 --> 02:34.540
is located of the center of the thatvendors designed for maximum

02:34.540 --> 02:38.890
skill way discharge of a parchmentforty seven thousand cubic feet.

02:39.060 --> 02:39.590
Per second.

02:40.920 --> 02:45.340
The maximum operating area will beseventy two acres with a maximum

02:45.370 --> 02:47.910
we've pool of two hundred fifty acres.

02:49.150 --> 02:52.740
An important part of the Portuguesedam construction will be

02:52.740 --> 02:54.030
the foundation browbeat.

02:55.170 --> 02:58.680
The foundation consist of fracturedenjoyed. It metamorphosis

02:58.680 --> 03:02.940
sensed on and conglomerates withprospered in dykes in. Shears.

03:04.870 --> 03:08.310
Can celebrations rallying will beused to from of the foundation

03:08.310 --> 03:12.770
and areas that are we put number of thefoundation brave in the infrastructure.

03:13.860 --> 03:17.630
What contact routing will be usedto tie together the top are

03:17.630 --> 03:21.280
talking fleet the foundation thatthe several for their and other

03:21.280 --> 03:25.730
areas that will be excavated andfield to remove shears or work

03:25.730 --> 03:28.410
them brought there and we'llwe'll foundation. Great.

03:32.800 --> 03:36.230
In addition from grand curtainwill be installed longer fall

03:36.230 --> 03:37.130
filed the their.

03:39.000 --> 03:42.970
Three inch minimum diameter holes willbe drilled from the foundation

03:42.970 --> 03:46.630
gallery to a maximum depth ofone hundred fifty six. Feet.

03:49.780 --> 03:52.920
Grout will be pomp under pressureto end of the holes to fill

03:52.920 --> 03:54.330
the cracks and crevices that's.

03:54.900 --> 03:58.290
The purpose of the grout curtainis to reduce the prawny beloved

03:58.290 --> 04:01.910
even the that there and to assistand the foundation drainage

04:01.940 --> 04:06.140
system introduced five for staticpressures incredible areas

04:06.170 --> 04:09.640
that make that there are increasingthe integrity of the foundation.

04:10.310 --> 04:13.310
When completed the Portuguese toand will be the first part to

04:13.310 --> 04:17.360
down the constructive into daddyStates and its territories using

04:17.360 --> 04:18.960
roller compacted concrete.

04:20.660 --> 04:24.150
An extensive concrete mix designwas performed by the U.S.

04:24.180 --> 04:25.500
army corps of engineers.

04:26.060 --> 04:29.380
To establish the mix proportionsand the physical and formal

04:29.380 --> 04:30.730
properties of the. Country.

04:34.320 --> 04:37.620
The construction will consist ofplacing the concrete and one

04:37.620 --> 04:39.310
four players across the. Them.

04:41.580 --> 04:46.100
That utilizing convey years thatdump trucks and those rich.

04:48.180 --> 04:51.970
The lingers will be and be contactedusing fiber tour rollers.

04:55.500 --> 05:00.530
That. The Portuguese dam projectwill require approximately three

05:00.530 --> 05:04.300
hundred sixty seven thousand cubicyards of concrete to construct.

05:05.550 --> 05:08.720
Of the features of the them includedcan take structure on the

05:08.750 --> 05:10.170
upstream face of the their.

05:10.910 --> 05:14.660
About all else with regulating outwas down strained of of them.

05:15.190 --> 05:16.810
And depressed access row.

05:19.080 --> 05:21.490
Doing the pudgy designedto the Portuguese them.

05:22.000 --> 05:25.080
The engineers of the Fort jacksonbuild the Street work with

05:25.080 --> 05:26.430
the force port when district.

05:27.710 --> 05:31.770
On the concrete mix design and materialstesting jackson of the

05:31.770 --> 05:34.750
Street work with the injuring researchand development center

05:34.750 --> 05:36.200
in pittsburgh Mississippi.

05:37.750 --> 05:41.030
The architectural and engineeringforum might go marine watson

05:41.030 --> 05:45.040
horrors of was contractor to perform theconduct and that technical review.

05:46.280 --> 05:49.460
Additionally the that of the lovelyconstructive that of the

05:49.740 --> 05:53.420
upper building environmental reviewwas conducted with you.

05:53.420 --> 05:56.480
So stents of experts fromseveral for districts.

05:58.000 --> 06:01.060
The jacksonville district alsowork for the poor of engineers

06:01.060 --> 06:04.820
computer aided structural engineeringtask group caves.

06:05.530 --> 06:09.810
To help develop auction down softwaretools and design criteria.

06:10.750 --> 06:14.380
The task group was composed of membersfrom the port engineers

06:14.450 --> 06:15.990
and the bureau of. Recollection.

06:18.110 --> 06:21.610
The Portuguese dam project. Sponsorsis the department of natural

06:21.610 --> 06:47.990
and environmental resources. That.That. That. That. That. That..

