(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Innovative Foundation Supports Arlington Caisson Horses

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    BALTIMORE, MARYLAND, UNITED STATES

    08.26.2025

    Video by David Adams 

    U.S. Army Corps of Engineers, Baltimore District   

    The helical pile foundation system for Arlington National Cemetery's interim horse stables, [INSERT DATE]. The U.S. Army Corps of Engineers designed the elevated platform to support 26 stalls housing draft horses weighing up to 2,000 pounds each, with the entire facility completely removable and relocatable after its three-year operational period. (U.S. Army Corps of Engineers video by David Adams)

    VIDEO INFO

    Date Taken: 08.26.2025
    Date Posted: 12.16.2025 07:44
    Category: B-Roll
    Video ID: 990351
    VIRIN: 250826-A-SE916-1077
    Filename: DOD_111440754
    Length: 00:02:25
    Location: BALTIMORE, MARYLAND, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN