Crews at Station Apra Harbor remove downed tree limbs as U.S. Coast Guard crews in Guam begin assessments and reconstitution efforts on May 25, 2023, after Typhoon Mawar devastated the island. Crews are working to resume operations and reopen the ports. (U.S. Coast Guard photo by Chief Warrant Officer Sara Muir)
Date Taken: | 05.25.2023 |
Date Posted: | 05.25.2023 04:53 |
Category: | B-Roll |
Video ID: | 884557 |
VIRIN: | 230525-G-IA651-461 |
Filename: | DOD_109658964 |
Length: | 00:00:13 |
Location: | GU |
Downloads: | 7 |
High-Res. Downloads: | 7 |
This work, U.S. Coast Guard Forces Micronesia Sector Guam begins assessments, reconstitution after Typhoon Mawar, by CWO2 Sara Muir, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT