Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    How to inprocess with 62 CPTS

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    WA, UNITED STATES

    06.01.2020

    Video by 94th Airlift Wing 

    62nd Airlift Wing

    Follow along step-by-step as you inprocess with the 62nd Comptroller Squadron Finance Office, June 1, 2020.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 06.01.2020
    Date Posted: 06.01.2020 19:33
    Category: Briefings
    Video ID: 754629
    VIRIN: 200601-F-XX000-001
    Filename: DOD_107836503
    Length: 00:01:59
    Location: WA, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN