Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cutting edge model improves the Fargo-Moorhead Metro Flood Risk Management Project

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    ST. PAUL, MN, UNITED STATES

    12.20.2019

    Video by Patrick Moes 

    U.S. Army Corps of Engineers, St. Paul District

    The St. Paul District, recently teamed up with the U.S. Army Engineer Research and Development Center's Coastal and Hydraulics Laboratory in Vicksburg, Mississippi, to build a model of the Red River Control Structure, which is part of the Fargo-Moorhead Metro Flood Risk Management Project for the Red River of the North. The model is helping engineers better understand the engineering, environmental considerations and public safety impacts of the project.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 12.20.2019
    Date Posted: 12.20.2019 12:10
    Category: Package
    Video ID: 731272
    VIRIN: 191220-A-LI073-001
    Filename: DOD_107546530
    Length: 00:03:45
    Location: ST. PAUL, MN, US

    Video Analytics


    Downloads: 10
    High-Res. Downloads: 10

    PUBLIC DOMAIN