Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Buffalo District Athol Springs Shore Protection Project

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Storms from Lake Erie cause water, ice and debris to overtop the failing seawall along Route 5 between Buffalo and the Southtowns, endangering 40,000 motorists a day. Buffalo District’s new project in Hamburg, NY will rebuild the seawall better and stronger, protecting our community.

    The $8.2 million project is expected to start in October 2019 and continue through the fall of 2020.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 10.24.2019
    Date Posted: 10.28.2019 13:53
    Category: Package
    Video ID: 717937
    VIRIN: 191024-A-PG036-949
    Filename: DOD_107379859
    Length: 00:00:41
    Location: US

    Video Analytics


    Downloads: 0
    High-Res. Downloads: 0

    PUBLIC DOMAIN