Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Megan Kreiger Interview on 3D Concrete Printer

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    CAMP PENDLETON, CA, UNITED STATES

    12.11.2018

    Video by Sgt. Conner Robbins 

    1st Marine Logistics Group

    Megan Kreiger a Mechanical Engineer and Project Manager with U.S. Army Corps of Engineers, Engineer Research And Development Center gives answers on the Automated Construction of Expeditionary Structures (ACES) at Camp Pendleton, CA on 11 Dec. 2018.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 12.11.2018
    Date Posted: 12.19.2018 15:03
    Category: B-Roll
    Video ID: 650502
    VIRIN: 181211-M-PL003-941
    Filename: DOD_106318125
    Length: 00:08:52
    Location: CAMP PENDLETON, CA, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN