Beginning this fall high speed passenger trains topping out at 79 mph will start running through Joint Base Lewis McChord up to 15 times per day. JBLM Police Chief Ted Solonar informs the community the time to start preparing for high speed rail is now. DO NOT try to beat these trains because you will not.
Date Taken: | 06.30.2017 |
Date Posted: | 12.18.2017 12:18 |
Category: | PSA |
Video ID: | 575165 |
VIRIN: | 170630-D-ML822-353 |
Filename: | DOD_105188642 |
Length: | 00:01:41 |
Location: | JOINT BASE LEWIS MCCHORD, WA, US |
Downloads: | 1 |
High-Res. Downloads: | 1 |
This work, JBLM RAIL SAFETY PSA, by Robert Coronado, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT