Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USACE Power Grid Work in Puerto Rico

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    The U.S. Army Corps of Engineers is working to restore the power grid in Puerto Rico after it was damaged by Hurricane Maria, a class five hurricane.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 12.05.2017
    Date Posted: 12.05.2017 14:43
    Category: Package
    Video ID: 570554
    VIRIN: 171205-A-BN725-151
    Filename: DOD_105139076
    Length: 00:00:35
    Location: PR

    Video Analytics


    Downloads: 13
    High-Res. Downloads: 13

    PUBLIC DOMAIN