Crew members of the Morgenstond unload 2 generators totaling 50 MW in San Juan, Puerto Rico, Oct. 13, 2017. The generators will provide power generation at the Palo Seco Plant, one of the main power providers to the city of San Juan. By providing emergency generation capacity to the Palo Seco Power Plant, more customers will receive electricity while repairs to the nearby transmission lines are completed. "This is an important step in our effort to restore power to Puerto Rico," said Brig. Gen. Diana Holland, U.S. Army Corps of Engineers, South Atlantic Division commander. "We look forward to continuing these efforts to bring normalcy to the people of the Commonwealth." (U.S. Army video by Pfc. Caitlyn Cassidy)
Date Taken: | 10.13.2017 |
Date Posted: | 10.13.2017 18:56 |
Category: | B-Roll |
Video ID: | 558206 |
VIRIN: | 171013-A-WM181-0018 |
Filename: | DOD_104960858 |
Length: | 00:01:05 |
Location: | SAN JUAN, PR |
Downloads: | 19 |
High-Res. Downloads: | 19 |
This work, Hurricane Maria Relief, by Caitlyn M Cassidy, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT